Greenline 33
65
F45
Inverter/charger
From LiPo battery via S6 via F47
48
100
ANL
F46
Hybrid control unit
Main HCU fuse
48
355
ANL
F47
LiPo battery bank
Main LiPo battery fuse
48
300
ANL
F48
Radio memory
From service bat. directly via F30
12
5
ATO
F49
Diesel heater controls
From service bat. directly via F30
12
5
ATO
F50
Defroster
From service bat. via S3 via F32
12
30
ATO
K3
Hybrid cooling pump
From F21 (control from engine key
switch #201)
12
30
Relay
K4
Engine blower
From F23 (control from engine key &
hybrid switch (D) #200)
12
30
Relay
K5
Defroster
From F50 (control from defroster
switch on console #95)
12
40
Relay
K6
Solar panels
From F40 to LiPo battery
24
40
Relay
K7
Solar panels
From F40 to LiPo battery
24
40
Relay
Содержание GREENLINE 33
Страница 1: ...OWNER S MANUAL GREENLINE 33 Revision 04 19 03 2012...
Страница 2: ...Greenline 33 II...
Страница 6: ...Greenline 33 VI Figure 38 Position of hoisting cradle and straps 88...
Страница 13: ...Greenline 33 6 Figure 1 Boat main dimensions...
Страница 16: ...Greenline 33 9 Figure 2 Boat examination report...
Страница 17: ...Greenline 33 10 Figure 3 Engine examination certificate VW SDI 75 5...
Страница 18: ...Greenline 33 11 Figure 4 Engine examination certificate VW TDI 165 5...
Страница 19: ...Greenline 33 12 Figure 5 Declaration of Conformity...
Страница 20: ...Greenline 33 13...
Страница 25: ...Greenline 33 18 MAN OVERBOARD PREVENTION AND RECOVERY Figure 8 Working deck area plan...
Страница 29: ...Greenline 33 22 FIGHT AGAINST FIRE EMERGENCY EXITS Figure 10 Fire extinguishers positions Emergency exits...
Страница 34: ...Greenline 33 27 Figure 14 Bilge pump system plan...
Страница 36: ...Greenline 33 29 4 HULL THROUGH HULL FITTINGS Figure 16 Thru hull fitting positions...
Страница 48: ...Greenline 33 41 7 PLUMBING Sea water plumbing Figure 22 Sea water plumbing...
Страница 49: ...Greenline 33 42 Freshwater plumbing Figure 23 Fresh water plumbing...
Страница 50: ...Greenline 33 43 Grey water plumbing Figure 24 Grey water plumbing...
Страница 58: ...Greenline 33 51 Picture 5 INVERTER switch Phoenix multi control on the dashboard...
Страница 74: ...Greenline 33 67 Picture 13 Main 12V power box Picture 14 Service box fuses...
Страница 76: ...Greenline 33 69 Picture 17 Shore power fuse Picture 18 LiPo battery bank main fuse...
Страница 77: ...Greenline 33 70 Picture 19 Hybrid box fuses Picture 20 Hybrid control unit main fuse...
Страница 93: ...Greenline 33 86 In case of steering mechanism failure mount emergency steering tiller directly on rudder shaft...
Страница 95: ...Greenline 33 88 PO SITIO N O F HO ISTING C RADLE AND STRAPS Figure 38 Position of hoisting cradle and straps...
Страница 99: ...Greenline 33 92 UN MOUNTING LIPO BATTERY BANK 8 STEPS Picture 1 Step 1 Picture 2 Steps 2 7...
Страница 100: ...Greenline 33 93 Picture 3 Step 7 Picture 4 Step 8 Step 1...
Страница 102: ...Greenline 33 95 12 APPENDIX A Wiring diagrams...
Страница 108: ...Greenline 33 101 14 NOTES...
Страница 109: ...Greenline 33 102...
Страница 110: ...Greenline 33 103...