Greenline 33
3
Always apply to an experienced professional for the maintenance, the assembly of accessories and minor
modifications. The written authorization of the builder or of his legal representative is compulsory for the
modifications that alter the specifications of the boat particularly the vertical layout of the masses (fitting of
radar, change of engine, etc...).
For the essential or optional equipments (engine, electronics ....), please refer to their respective manuals
delivered with the boat.
The users of this boat are informed of the following:
-
The entire crew must have an appropriate training;
-
The boat must not be loaded more than the maximum load recommended by the builder (in particular
as for the total weight of the food supplies, of the different equipments that are not supplied by the
builder and the weight of the persons on board) and this load must be properly distributed;
-
The water of the bilges must be kept at its minimum;
-
The stability is reduced when you add some weight in the upper parts;
-
In case of rough sea, the hatches, lockers and doors must be closed in order to minimize the risk of
water coming in;
-
The stability may be reduced when you tow a boat or when you lift heavy weights with the davits or
the boom;
-
Breaking waves are important dangers to stability;
-
The crew must be familiar with the use of all the safety equipment (harness, flares, life- raft, etc...) and
the emergency safety handlings (man overboard fishing out, towing, etc...).
PLEASE KEEP THIS MANUAL IN A SECURE PLACE, AND HAND IT OVER TO THE NEW OWNER WHEN YOU SELL
THE CRAFT."
Содержание GREENLINE 33
Страница 1: ...OWNER S MANUAL GREENLINE 33 Revision 04 19 03 2012...
Страница 2: ...Greenline 33 II...
Страница 6: ...Greenline 33 VI Figure 38 Position of hoisting cradle and straps 88...
Страница 13: ...Greenline 33 6 Figure 1 Boat main dimensions...
Страница 16: ...Greenline 33 9 Figure 2 Boat examination report...
Страница 17: ...Greenline 33 10 Figure 3 Engine examination certificate VW SDI 75 5...
Страница 18: ...Greenline 33 11 Figure 4 Engine examination certificate VW TDI 165 5...
Страница 19: ...Greenline 33 12 Figure 5 Declaration of Conformity...
Страница 20: ...Greenline 33 13...
Страница 25: ...Greenline 33 18 MAN OVERBOARD PREVENTION AND RECOVERY Figure 8 Working deck area plan...
Страница 29: ...Greenline 33 22 FIGHT AGAINST FIRE EMERGENCY EXITS Figure 10 Fire extinguishers positions Emergency exits...
Страница 34: ...Greenline 33 27 Figure 14 Bilge pump system plan...
Страница 36: ...Greenline 33 29 4 HULL THROUGH HULL FITTINGS Figure 16 Thru hull fitting positions...
Страница 48: ...Greenline 33 41 7 PLUMBING Sea water plumbing Figure 22 Sea water plumbing...
Страница 49: ...Greenline 33 42 Freshwater plumbing Figure 23 Fresh water plumbing...
Страница 50: ...Greenline 33 43 Grey water plumbing Figure 24 Grey water plumbing...
Страница 58: ...Greenline 33 51 Picture 5 INVERTER switch Phoenix multi control on the dashboard...
Страница 74: ...Greenline 33 67 Picture 13 Main 12V power box Picture 14 Service box fuses...
Страница 76: ...Greenline 33 69 Picture 17 Shore power fuse Picture 18 LiPo battery bank main fuse...
Страница 77: ...Greenline 33 70 Picture 19 Hybrid box fuses Picture 20 Hybrid control unit main fuse...
Страница 93: ...Greenline 33 86 In case of steering mechanism failure mount emergency steering tiller directly on rudder shaft...
Страница 95: ...Greenline 33 88 PO SITIO N O F HO ISTING C RADLE AND STRAPS Figure 38 Position of hoisting cradle and straps...
Страница 99: ...Greenline 33 92 UN MOUNTING LIPO BATTERY BANK 8 STEPS Picture 1 Step 1 Picture 2 Steps 2 7...
Страница 100: ...Greenline 33 93 Picture 3 Step 7 Picture 4 Step 8 Step 1...
Страница 102: ...Greenline 33 95 12 APPENDIX A Wiring diagrams...
Страница 108: ...Greenline 33 101 14 NOTES...
Страница 109: ...Greenline 33 102...
Страница 110: ...Greenline 33 103...