Greenline 33
25
- the location of routed and exits.
Cautionary notices to the boat operator
Keep the bilges clean and check for fuel and gas vapours or fuel leaks frequently.
When replacing parts of the fire-fighting installation, only matching components shall be used, bearing the
same designation or having equivalent technical and fire-resistant capabilities.
Do not fit free-hanging curtains or other fabrics in the vicinity of, or above, cookers or other open-flame
devices.
Do not stow combustible material in the engine space. If non-combustible materials are stowed in the engine
space, they shall be secured against falling into machinery and shall cause no obstruction to access into or
from the space.
EXPLANATION OF THE SYMBOLS DISPLAYED IN THE CRAFT
Figure 11: Table of symbols
Содержание GREENLINE 33
Страница 1: ...OWNER S MANUAL GREENLINE 33 Revision 04 19 03 2012...
Страница 2: ...Greenline 33 II...
Страница 6: ...Greenline 33 VI Figure 38 Position of hoisting cradle and straps 88...
Страница 13: ...Greenline 33 6 Figure 1 Boat main dimensions...
Страница 16: ...Greenline 33 9 Figure 2 Boat examination report...
Страница 17: ...Greenline 33 10 Figure 3 Engine examination certificate VW SDI 75 5...
Страница 18: ...Greenline 33 11 Figure 4 Engine examination certificate VW TDI 165 5...
Страница 19: ...Greenline 33 12 Figure 5 Declaration of Conformity...
Страница 20: ...Greenline 33 13...
Страница 25: ...Greenline 33 18 MAN OVERBOARD PREVENTION AND RECOVERY Figure 8 Working deck area plan...
Страница 29: ...Greenline 33 22 FIGHT AGAINST FIRE EMERGENCY EXITS Figure 10 Fire extinguishers positions Emergency exits...
Страница 34: ...Greenline 33 27 Figure 14 Bilge pump system plan...
Страница 36: ...Greenline 33 29 4 HULL THROUGH HULL FITTINGS Figure 16 Thru hull fitting positions...
Страница 48: ...Greenline 33 41 7 PLUMBING Sea water plumbing Figure 22 Sea water plumbing...
Страница 49: ...Greenline 33 42 Freshwater plumbing Figure 23 Fresh water plumbing...
Страница 50: ...Greenline 33 43 Grey water plumbing Figure 24 Grey water plumbing...
Страница 58: ...Greenline 33 51 Picture 5 INVERTER switch Phoenix multi control on the dashboard...
Страница 74: ...Greenline 33 67 Picture 13 Main 12V power box Picture 14 Service box fuses...
Страница 76: ...Greenline 33 69 Picture 17 Shore power fuse Picture 18 LiPo battery bank main fuse...
Страница 77: ...Greenline 33 70 Picture 19 Hybrid box fuses Picture 20 Hybrid control unit main fuse...
Страница 93: ...Greenline 33 86 In case of steering mechanism failure mount emergency steering tiller directly on rudder shaft...
Страница 95: ...Greenline 33 88 PO SITIO N O F HO ISTING C RADLE AND STRAPS Figure 38 Position of hoisting cradle and straps...
Страница 99: ...Greenline 33 92 UN MOUNTING LIPO BATTERY BANK 8 STEPS Picture 1 Step 1 Picture 2 Steps 2 7...
Страница 100: ...Greenline 33 93 Picture 3 Step 7 Picture 4 Step 8 Step 1...
Страница 102: ...Greenline 33 95 12 APPENDIX A Wiring diagrams...
Страница 108: ...Greenline 33 101 14 NOTES...
Страница 109: ...Greenline 33 102...
Страница 110: ...Greenline 33 103...