Greenline 33
38
DECK MAINTENANCE
Do not use any solvent or solvent based products.
Regularly brush the deck with a degreasing shampoo and fresh water.
EQUIPMENT
-
Rinse liberally all equipment with fresh water,
-
Regularly lubricate all blocks, sheaves, bottle screws, winches, rails and travellers with a water-
repellent grease,
-
Clean and polish the stainless steel parts that may have small rusty spots or minor oxidation pits (you
will find this product in the maintenance case).
OUTSIDE VARNISHED WOOD
-
Rinse varnish with degreasing shampoo mixed with fresh water,
-
Polish with shammy leather.
OUTSIDE MASSIVE WOOD
-
Regularly rinse woodworks with freshwater and scrub with soft brush.
-
Dress massive-wood with fine sand paper to restore its colour. Minor deck damages (small abrasions)
can be sanded out. Caulking damages is recommended to repair to prevent water ingress into the
seams
-
Stain can be removed with scrubbing locally across the grain with stiff brush using water and
detergent. For heavy duty stains you can use Teak Cleaner. Rinse off thoroughly.
-
To reduce wood drying, you can use wood natural’s preserving oil (“teak oil”).
PLEXIGLASS
-
Rinse Plexiglas with fresh water (do not use any solvent base products),
-
Brighten up with soft rags soaked in paraffin oil,
-
Use special polish paste adhering to remove scratches.
Содержание GREENLINE 33
Страница 1: ...OWNER S MANUAL GREENLINE 33 Revision 04 19 03 2012...
Страница 2: ...Greenline 33 II...
Страница 6: ...Greenline 33 VI Figure 38 Position of hoisting cradle and straps 88...
Страница 13: ...Greenline 33 6 Figure 1 Boat main dimensions...
Страница 16: ...Greenline 33 9 Figure 2 Boat examination report...
Страница 17: ...Greenline 33 10 Figure 3 Engine examination certificate VW SDI 75 5...
Страница 18: ...Greenline 33 11 Figure 4 Engine examination certificate VW TDI 165 5...
Страница 19: ...Greenline 33 12 Figure 5 Declaration of Conformity...
Страница 20: ...Greenline 33 13...
Страница 25: ...Greenline 33 18 MAN OVERBOARD PREVENTION AND RECOVERY Figure 8 Working deck area plan...
Страница 29: ...Greenline 33 22 FIGHT AGAINST FIRE EMERGENCY EXITS Figure 10 Fire extinguishers positions Emergency exits...
Страница 34: ...Greenline 33 27 Figure 14 Bilge pump system plan...
Страница 36: ...Greenline 33 29 4 HULL THROUGH HULL FITTINGS Figure 16 Thru hull fitting positions...
Страница 48: ...Greenline 33 41 7 PLUMBING Sea water plumbing Figure 22 Sea water plumbing...
Страница 49: ...Greenline 33 42 Freshwater plumbing Figure 23 Fresh water plumbing...
Страница 50: ...Greenline 33 43 Grey water plumbing Figure 24 Grey water plumbing...
Страница 58: ...Greenline 33 51 Picture 5 INVERTER switch Phoenix multi control on the dashboard...
Страница 74: ...Greenline 33 67 Picture 13 Main 12V power box Picture 14 Service box fuses...
Страница 76: ...Greenline 33 69 Picture 17 Shore power fuse Picture 18 LiPo battery bank main fuse...
Страница 77: ...Greenline 33 70 Picture 19 Hybrid box fuses Picture 20 Hybrid control unit main fuse...
Страница 93: ...Greenline 33 86 In case of steering mechanism failure mount emergency steering tiller directly on rudder shaft...
Страница 95: ...Greenline 33 88 PO SITIO N O F HO ISTING C RADLE AND STRAPS Figure 38 Position of hoisting cradle and straps...
Страница 99: ...Greenline 33 92 UN MOUNTING LIPO BATTERY BANK 8 STEPS Picture 1 Step 1 Picture 2 Steps 2 7...
Страница 100: ...Greenline 33 93 Picture 3 Step 7 Picture 4 Step 8 Step 1...
Страница 102: ...Greenline 33 95 12 APPENDIX A Wiring diagrams...
Страница 108: ...Greenline 33 101 14 NOTES...
Страница 109: ...Greenline 33 102...
Страница 110: ...Greenline 33 103...