Ultra Heat GMV VRF Technical Service Manual COMMISSIONING OPERATION
87
code
‖U3‖ should disappear.
3.2.4 Communication system check
(1) The following communication contents must be checked again before commissioning:
(2) Communication cables cannot be laid out in the same trough as power cables. Communication
cables should be independently laid out in hard fire-resistant PVC tubes. The parallel spacing between
communication cables and strong electric wires should be larger than 20 cm.
3.2.5 Spot check
Spot Check for Ultra Heat GMV Commissioning
SN
Spot Check Item
Qualified
1
Is the engineering design diagram complete?
2
Does the construction comply with the design diagram?
3
Is the rated capacity of the IDU/ODU of a single refrigerating system within 50%-135%?
4
Is the number of connected IDUs in a single refrigerating system within 80?
5
Is the access capacity of a fresh-air unit within 30%?
6
Does the difference of level between IDUs and ODUs comply with unit design requirements?
7
Does the difference of level between IDUs comply with unit design requirements?
8
Are long pipes of IDUs and ODUs less than or equal to 165 m
(
541ft
)
?
9
Is the total length of pipes less than 1000 m
(
3280ft
)
?
10
Is the spacing between the ODU and the first disperse pipe larger than 90 m
(
295ft
)
? If yes, is the
corresponding pipe diameter increased?
11
Is the spacing between the IDU and the nearest disperse pipe larger than 10 m
(
33ft
)
? If yes, is the
corresponding pipe diameter increased?
Содержание Ultra Heat GMV-V72W/A-F
Страница 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Pump Series...
Страница 22: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 17 CHAPTER 2 INSTALLATION...
Страница 26: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 21...
Страница 77: ...Ultra Heat GMV VRF Technical Service Manual COMMISSIONING OPERATION 72 CHAPTER 3 COMMISSIONING OPERATION...
Страница 105: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 100 CHAPTER 4 MAINTENANCE...
Страница 116: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 111...
Страница 117: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 112 2 System high pressure protection E1...
Страница 118: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 113 3 System low pressure protection E3...
Страница 119: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 114 4 System refrigerant lacking protection U4...
Страница 121: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 116 7 Temperature sensor fault 8 Pressure sensor fault...
Страница 149: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 144 6 Install a new compressor drive screw and wire it PFC board...
Страница 180: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 175 CHAPTER 5 REMOTE CONTROL...
Страница 186: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 181 2 Set software installation catalogue...
Страница 191: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 186 5 USING DEBUGGER 5 1 Manual for Initial Usage...
Страница 206: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 201...
Страница 239: ......
Страница 240: ...Jf00303483...