![Gree Ultra Heat GMV-V72W/A-F Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/gree/ultra-heat-gmv-v72w-a-f/ultra-heat-gmv-v72w-a-f_service-manual_2260160019.webp)
Ultra Heat GMV VRF Technical Service Manual UNIT INTRODUCTION
14
2. Each ODU system can be connected to multiple IDUs. Detailed information about the number of
units to be connected and capacity ranges is shown in the following table:
Model
Maximum Number of
Connected IDUs (units)
Capacity Range of Connected IDU (kBtu/h)
Minimum Capacity
Maximum Capacity
GMV-V72W/A-F(U)
12
36.0
97.2
GMV-V96W/A-F(U)
17
48.0
129.6
During installation, please strictly follow the above capacity range and number to construct, otherwise,
units may work abnormally and compressors may even be damaged
7 PRECAUTIONS ON REFRIGERANT LEAKAGE
Personnel related to air conditioning engineering design and installation operators must abide by the
safety requirement for preventing refrigerant leakage specified in local laws and regulations. If such
safety requirement is unavailable in local documents, the design and operation must be implemented
based on the following principles: Ultra Heat GMV series VRF units adopt the R410A refrigerant, which
is nonflammable and nontoxic. However, the space for refrigerant leakage must be sufficient to ensure
that the refrigerant concentration does not exceed that specified in the safety requirement; otherwise,
people involved can be stifled by the refrigerant.
The maximum refrigerant charge and maximum refrigerant concentration in the system are
calculated directly based on the size of the air conditioning space. The unit of refrigerant concentration is
1 kg/m³ or 1lb/m³.
Содержание Ultra Heat GMV-V72W/A-F
Страница 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Pump Series...
Страница 22: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 17 CHAPTER 2 INSTALLATION...
Страница 26: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 21...
Страница 77: ...Ultra Heat GMV VRF Technical Service Manual COMMISSIONING OPERATION 72 CHAPTER 3 COMMISSIONING OPERATION...
Страница 105: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 100 CHAPTER 4 MAINTENANCE...
Страница 116: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 111...
Страница 117: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 112 2 System high pressure protection E1...
Страница 118: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 113 3 System low pressure protection E3...
Страница 119: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 114 4 System refrigerant lacking protection U4...
Страница 121: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 116 7 Temperature sensor fault 8 Pressure sensor fault...
Страница 149: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 144 6 Install a new compressor drive screw and wire it PFC board...
Страница 180: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 175 CHAPTER 5 REMOTE CONTROL...
Страница 186: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 181 2 Set software installation catalogue...
Страница 191: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 186 5 USING DEBUGGER 5 1 Manual for Initial Usage...
Страница 206: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 201...
Страница 239: ......
Страница 240: ...Jf00303483...