
Ultra Heat GMV VRF Technical Service Manual INSTALLATION
71
Step 2: Turn on the valves for the liquid and gas pipes of each module completely.
Step 3: Make the system to run in commissioning mode via the commissioning software or the main
board of the ODU. (For details, see the description on commissioning.)
Step 4: When the commissioning step goes to refrigerant perfusion, turn on the valve of the
refrigerant tank and perfuse the remaining quantity.
Step 5: After all refrigerant is perfused, turn off valve of the refrigerant tank and wait till
commissioning is automatically is completed for the system.
Step 6: Remove the pressure gauge to finish refrigerant perfusion.
Because R410A is a mixture of refrigerant, therefore, it must be charged in a liquid form.
Otherwise, unit will not work stably and effectively.
Do not expose the R410A refrigerant tank to direct sunlight. Otherwise, the internal pressure may
get too high and cause explosion.
Pipeline for the R410A refrigerating system must have relevant valid certificates.
During welding, avoid overheating the pipeline.
System must not filled with refrigerant other than R410A.
Pipe to be vacuumed : gas pipe, water pipe, common pipe
If the refrigerant amount is not exact, it may not operate properly.
If additionally bottled refrigerant amount is over ±10%, condenser burning or insufficient indoor
unit performance may be caused.
Содержание Ultra Heat GMV-V72W/A-F
Страница 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Pump Series...
Страница 22: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 17 CHAPTER 2 INSTALLATION...
Страница 26: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 21...
Страница 77: ...Ultra Heat GMV VRF Technical Service Manual COMMISSIONING OPERATION 72 CHAPTER 3 COMMISSIONING OPERATION...
Страница 105: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 100 CHAPTER 4 MAINTENANCE...
Страница 116: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 111...
Страница 117: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 112 2 System high pressure protection E1...
Страница 118: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 113 3 System low pressure protection E3...
Страница 119: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 114 4 System refrigerant lacking protection U4...
Страница 121: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 116 7 Temperature sensor fault 8 Pressure sensor fault...
Страница 149: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 144 6 Install a new compressor drive screw and wire it PFC board...
Страница 180: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 175 CHAPTER 5 REMOTE CONTROL...
Страница 186: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 181 2 Set software installation catalogue...
Страница 191: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 186 5 USING DEBUGGER 5 1 Manual for Initial Usage...
Страница 206: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 201...
Страница 239: ......
Страница 240: ...Jf00303483...