![Gree GVA60AH-M3NNA5A Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/gree/gva60ah-m3nna5a/gva60ah-m3nna5a_service-manual_2260414034.webp)
+PUVCNNCVKQP/CPWCN
,QVWDOODWLRQRI,QGRRU8QLW
1.As shown in Fig.2,take out the decorative strip at position 1 and
then unscrew the screws.Remove the screws fixing the filter after
opening the glass panel.At last take out the filter along the arro w
direction at position 3.
2.During piping and wiring in the left and at the rear side,the
attached accessories should be used,as shown in Fig.4 .
1. Make sure drainage pipe is led outdoors (discharge side).
2. Butt-joint drainage pipe in the unit with blowing drainage pipe and fix them with insulated tape.
3. If the drainage pipe should be wrapped with heat-preservation material (at least 9 mm thickness), and then wrap it with tape
prevent air from entering into the pipe,which will cause condensation.
4. After connecting, check if water can discharge properly or if there is any leakage. (As shown in Fig.5)
Electric connection
Installation of connection pipe
Drainage
pipe
Connection pipe
Flare-end connection
Flare-end connection
Fig.2
Fig.3
Fig.5
Fig.4
Connection pipe
Drainagepiping hole
Drainage pipe
Blowing
drainage pipe
Wrapping tape
Before wiring and piping, please remove the filter after opening the glass panel.
4. According to the diagram for wiring,according to the marks on wire board for connection correspondingly,as shown in Fig.6.
Fig.6.
1.Disassemble the air intake grill.
2.Remove screws from the cover of electric box to expose the box.
3.Put the power connection wire through the single wire hole of the indoor unit rear side, the pull it out from the front.
Installation of drainage pipe
YEGN
BU
VT
BK
BN
L1 L2 L3
N
Outdoor unit terminal board
to