GREE hotovoltaic Multi VRF for North America
137
Removal operation for plate heat exchanger
Remark: Before removing the plate heat exchanger, please make sure that there’s no refrigerant inside the pipeline
of system and disconnect the power
Process
Photo
Operation Instruction
4) Replace gas
liquid separator
● Weld the pipe
connected with plate
heat exchanger
Note: During welding
process, do not let
flame burn out other
parts
2)Disconnect
inlet pipe and
outlet pipe of
plate heat
exchanger
● Weld those 4
connection spots on
the plate heat
exchanger, and then
pull out the
connection pipe.
Note: During welding
process, do not let
flame burn out other
parts
Содержание GMV-Y36WL/A-T
Страница 1: ...Photovoltaic Multi VRF for North America Capacity 36 kBtu h 60 kBtu h Rated Frequency 60 Hz...
Страница 3: ...GREE Photovoltaic Multi VRF for North America 1 PRODUCT...
Страница 15: ...GREE Photovoltaic Multi VRF for North America 13 CONTROL...
Страница 18: ...GREE Photovoltaic Multi VRF for North America 16 2 Wired Controller 2 1 Control panel...
Страница 19: ...GREE Photovoltaic Multi VRF for North America 17...
Страница 20: ...GREE Photovoltaic Multi VRF for North America 18 Button Graphics...
Страница 28: ...GREE Photovoltaic Multi VRF for North America 26 4 3 2 2 Appearance...
Страница 34: ...GREE Photovoltaic Multi VRF for North America 32 Installation is in progress...
Страница 37: ...GREE Photovoltaic Multi VRF for North America 35 Installation is in progress...
Страница 39: ...GREE Photovoltaic Multi VRF for North America 37 Click Next...
Страница 57: ...GREE Photovoltaic Multi VRF for North America 55...
Страница 68: ...GREE Photovoltaic Multi VRF for North America 66 Click Get to get the current setting details of converter...
Страница 69: ...GREE Photovoltaic Multi VRF for North America 67 Switchover of Software Languages...
Страница 70: ...GREE hotovoltaic Multi VRF for North America 68 INSTALLATION...
Страница 102: ...GREE hotovoltaic Multi VRF for North America 100 MAINTENANCE...
Страница 147: ...JF00303833...