2018-07-23
401-652M
YP-425, 625, 825, & 1025-A3P
Appendix C - Initial Setup
118
Appendix C - Initial Setup
This Appendix covers setup tasks performed only once,
or at infrequent intervals. Routine setup tasks are
covered in “
Perform Appendix B tasks first. Some of these items may
already have been done by your Great Plains dealer:
a.
Seed monitor console installation (below)
b.
Marker setup (Option, page 119)
c.
Scrapers (Option, page 122)
Seed Monitor Console Installation
The planter’s standard PM300 seed monitor system
includes a console
that needs to be mounted in the
cab of the tractor to be used with the planter.
Transport and Field Safety Risk:
Mount the module so it is easy to monitor during planting, but
does not interfere with safe operation of the tractor in the field
or on public roads.
The monitor includes cables for power
, speed
sensor
and sensor harness
. Installation instructions
are found in the included DICKEY-john
®
manual.
Power color code is:
+ positive: red
- negative: black
The included bracket
requires customer-supplied
fasteners.
Post-Delivery Checklist
1.
Read and understand “
2.
Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.
3.
Check that all grease fittings are in place and
lubricated. See “
4.
Check that all safety decals and reflectors are
correctly located and legible. Replace if damaged.
See “
5.
Inflate tires to pressure recommended and tighten
wheel bolts as specified. See “
Figure 104
PM300 Tractor Components
28138
1
3
4
2
5
Содержание YP-425
Страница 128: ...Table of Contents Index Table of Contents Index...
Страница 133: ...Table of Contents Index Table of Contents Index...
Страница 134: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402...