YP-425, 625, 825, & 1025-A3P
Operating Instructions
43
2018-07-23
401-652M
Field Operation
and “
Consult seed monitor for alarms during planting. Check
that reported rates are consistent with your plan.
When reloading seed, check consumption against
anticipated use to that point.
First Pass Operation Checklist
Page
1.
Slide gates open. Shutters set.
2.
Raise planter and line up at start of first
planting row.
3.
Prime meters with seed.
Leave fan running.
4.
Unfold marker on next-row side.
5.
Pull forward, lower planter, and begin planting
for a short distance.
6.
Stop. Assess:
•
planting depth
•
seed spacing
•
press wheel operation
-
7.
Make necessary adjustments
8.
Resume planting.
-
Sharp Field Turns
a
Checklist
a. Monitor manifold pressure during end-of-pass operations
and turns. Adjust operations as needed to maintain meter
pressurization.
Page
1.
Fold marker
2.
Raise planter when fold is complete
3.
Make turn
4.
Lower planter
5.
Unfold marker on next-row side.
6.
Resume planting.
Suspending Planting Checklist
Page
1.
Stop tractor
-
2.
Fan hydraulic circuit to Float or Neutral
3.
Hydraulic drive circuit to Float or Neutral
-
4.
Fold Marker
5.
Raise planter
Ending Planting Checklist
Page
1.
Suspend operations as above, then
2.
Lights ON
-
3.
Transport
Содержание YP-425
Страница 128: ...Table of Contents Index Table of Contents Index...
Страница 133: ...Table of Contents Index Table of Contents Index...
Страница 134: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402...