
2018-08-15
591-049M
LC25/40
Operating Instructions
24
Operations Checklists
Hitching
Match hitch Category to tractor (page 14).
Hitch tractor 3-point, lower arms first (page 16).
Hookup hydraulic hoses (page 16).
Hookup electrical connections (page 17).
Transport
If the towing vehicle has not been previously used
with this implement, check its rated list and towing
capacity vs. the implement weight (page 22). Ballast
as required.
If implement is unfolded:
Raise parking stands (page 17).
Check the lights are working.
Raise implement to a height providing adequate
transport clearance. Set lift circuit to Neutral.
Travel with caution (page 22).
Field Start (wings/folding LC40 only)
Check that wing lock pins are not in lock position
(page 19).
Unfold the implement (page 21).
Lock wings if field work requires it (page 19).
Set up row tools (page 26).
Check levels (page 18 and page 27).
Position rows inside field edge. Lower tool bar to
preset height. Pull forward.
Field Turns
Lift implement.
Fold wings up slightly if turn clearance requires it,
and wing lock pins are not installed.
Make turn.
Unfold.
Lower and pull forward.
End Field Work
Lift implement.
If employed, move lock pins from lower locking holes
to upper storage holes (page 19).
Fold implement.
Travel with caution (page 22).
Check that wing lock pins are not in lock
configuration (page 19).
Fold implement (page 20).