GRAUPNER GmbH & Co. KG D-73230 KIRCHHEIM/TECK GERMANY
We reserve the right to introduce modifications. Not liable for printing errors!
12/2011
4
capacity of the rechargeable battery can be checked with Graupner Battery GUARD
Order No. 7599. See also the insert included with the battery.
For the connection of the two ailerons and the landing flap servos to the receiver,
extension cables Order No. 3935.18 are required.
Each of the two aileron servo cables needs an extension cable, Order No. 3935.50;
the two landing flap servo cables Order No. 3935.18; the elevator servos Order No.
3935.50; and the bow landing gear servo Order No. 3935.50 for extension.
Receiver and battery: Store in foam material.
Any servo of standard size and an adjusting power of about 50 Ncm can be installed.
Adhesives
Epoxy glue, for example UHU plus schnellfest, Order No. 962
Epoxy glue, for example UHU plus endfest 300, Order No. 950.43
"UHU Holzleim express" casein glue, Order No. 958.60
UHU hart, for example Order No. 534.35
Fast setting glue, for example Order No. 5821
Fast-setting (cyano-acrylate) glue, such as Order No. 5822
Thread lock fluid, for example Order No. 952
Accessories for operation (not included)
Fuel, depending on the motor petrol/oil mixture (see instructions for the motor used)
Fuel hose, for example Order No. 1325.2
Manual fuel pump, for example Order No. 6870
Ignition battery, Order No. 8716.5
Charger cables and chargers for electric aircraft
Required tools (not included)
Various (Phillips) screwdrivers, needle-nose pliers, flat-nose pliers, wire cutter, balsa
knife or razor blade, various drills, pencil, felt marker, soldering iron with fine tip.
Assembly of the BO 209 MONSUN