NAB M
Pict. 5.4.4
REPLACEMENT OF RUBBER ROLLER DRIVE PIN
a) Dismantle rubber roller following sequence as
“
Replacement of rubber roller assembly
“.
b) Dismantle right side guard (Pict. 5.4.3)
Referring pict.5.4.4
c) Loose chain stretcher (
273
) and open chain
(10265)
.
d) Dismantle rubber roller pinion (
304
) and take out key
(2169)
.
e) Unthread rubber roller drive pin (
9861
) and replace it.
Should bush component replacing be required proceed as
follows :
f) Unscrew the screw that fixed bush to rubber roller side.
g) Leave out snap ring (
323
).
h) Extract bearings (
324
) and oil seal (
10299
).
i) Replace worn elements. Then reassemble everything
following preceding steps in reverse order. Grease oil seal
and bearings before inserting new rubber roller drive pin.
Содержание NAB M
Страница 2: ...NAB M...
Страница 4: ...NAB M Page left intentionally blank...
Страница 8: ...NAB M Page left intentionally blank...
Страница 15: ...NAB M 1 5 GENERAL DESCRIPTION OF OPERATION 10 8 7 9 11 12 Pict 1 5 1 1 2 6...
Страница 16: ...NAB M 3 4 Pict 1 5 2 5...
Страница 18: ...NAB M Page left intentionally blank...
Страница 21: ...NAB M Pict 2 1 1 Pict 2 3 2 Pict 2 3 1...
Страница 26: ...NAB M Pict 2 8 1 2 8 STARTING THE MACHINE 16 17 10 27 21 24 28...
Страница 34: ...NAB M Page left intentionally blank...
Страница 36: ...NAB M 4 1 CLEANING AND WASHING Pict 4 1 1 Pict 4 1 2 Pict 4 1 3 Pict 4 1 4...
Страница 40: ...NAB M 5 1 POINTS OF PREVENTIVE MAINTENANCE Pict 5 1 1 MO...
Страница 52: ...NAB M 6 1 PNEUMATIC SYSTEM...
Страница 54: ...NAB M Page left intentionally blank...
Страница 58: ...NAB M Page left intentionally blank...
Страница 68: ...NAB M 9 6 RUBBER ROLLER...
Страница 76: ...NAB M 9 10 CANVAS OUTFEED BELT 21225DX 21225SX...
Страница 78: ...NAB M 9 11 INFEED MODULAR BELT...
Страница 80: ...NAB M 9 12 OUTFEED MODULAR BELT...
Страница 82: ...NAB M 9 13 ELECTRIC SYSTEM...
Страница 92: ...NAB M Page left intentionally blank...