ACCESSING THE FLUEWAY
The Graphite Boiler allows you to sweep the flue
system through the stove without the need to
disconnect the flue pipe. An easy-to-remove panel
runs along the top of the firechamber at the front and
provides complete access to the top of the boiler as
well as the flueway.
First remove the stove lid by undoing the two bolts
towards the rear of the flue pipe. Use the correct sized
Phillips crosshead screwdriver. The heavy cast iron lid
can then be pulled forward and lifted free, leaving the
lid retainer behind. Carefully remove the three access
panel bolts with the correct sized socket or ring
spanner and loosen and remove any fire cement seal.
Gently and evenly prise around the plate to free it
from its cement seal. Do not attempt to lever the plate
from one point only as this could put undue pressure
where the plate still secured, causing it to crack.
Clean the boiler and flueway using a lightweight wire
brush if necessary. Check the access plate gasket is in
good condition and replace if necessary. Reverse the
procedure to refit the access plate and lid. Use the
minimum amount of cement on the seal as you will
need to be able to remove the access plate next time.
11
Remove bolts from lid retainer as shown
To remove lid, pull forwards and lift upwards
Flueway Access Plate
Содержание GR910-B
Страница 4: ...4 GENERAL DIMENSIONS ...
Страница 22: ... 23 ...