FIRST SERVICE
Work carried out:
SECOND SERVICE
Work carried out:
THIRD SERVICE
Work carried out:
FOURTH SERVICE
Work carried out:
FIFTH SERVICE
Work carried out:
Next Service Due
Signed
Dealer’s Stamp or HETAS Registration Number
Next Service Due
Signed
Dealer’s Stamp or HETAS Registration Number
Next Service Due
Signed
Dealer’s Stamp or HETAS Registration Number
Next Service Due
Signed
Dealer’s Stamp or HETAS Registration Number
Next Service Due
Signed
Dealer’s Stamp or HETAS Registration Number
Date
Date
Date
Date
Date
ANNUAL SERVICE
In the interests of safety it is important that your
Graphite Boiler stove is serviced on an annual basis in
accordance with the instructions outlined below. This
should be carried out by a suitably qualified person
such as your original approved installer, a Hetas or
INFO registered installer or your authorised Graphite
dealer.
When the stove is cold strip, clean and inspect it.
Internal Components
Remove and inspect the
following: Baffle Plate, Grate Assembly and Ash Pan.
Remove the flueway access panel (see pages 8 – 9).
Use a stiff brush to clean the baffle plate, the top of
the boiler and flueway as well as the grate assembly.
Carefully wire brush the inside of the stove which is
essentially the outside of the boiler and remove all ash
and debris from the firebox and ash pan chamber.
Check all parts for wear or damage and replace as
necessary. Re-fit internal parts and flueway access lid.
Stove Glass
Check the glass for chips or cracks and
the glass seal condition and replace if necessary.
Thoroughly clean the stove glass on both sides.
Door Seal
Check that this makes an air-tight seal and
replace if necessary. Ensure that the new rope joint is
also in the middle at the base of the rope seal channel
External Bodywork
All external surfaces should be
dusted with a soft cloth or light brush.
• Examine all paintwork for signs of wear and re-paint
these areas using an appropriate heat-resistant black
aerosol paint.
Warning: do not use the aerosol if the
stove is alight or hot.
• When the aerosol paint has dried, apply traditional
stove black polish to all painted surfaces
• Lightly oil the hinges and locking mechanism
Air Controls
When standing down at the end of
the heating season these should be left in the open
position to allow some movement of air which will
help avoid condensation and moisture building up
inside the stove and flue system. These can be closed
up to 50% if it gets too draughty.
Liner Connection
If a chimney liner has been
installed then if possible check that the liner is secure
and that the cement seal is still good. Repair any
crumbling or failed seals. Alternatively get your sweep
to check this for you.
Important
In the interests of safety use only genuine
Graphite replacement parts which are readily available
from your authorised dealer.
NB
It is advisable to have the chimney or flue system
swept at the same time.
34
Содержание GR910-B
Страница 4: ...4 GENERAL DIMENSIONS ...
Страница 22: ... 23 ...