OPERATING THE CRAFT
34
Fig. 15. Tube inflation sequence.
Check the pressure in each chamber with a pressure gauge. If you do not have a pressure gauge
the following procedure will serve as a guide. Press a finger firmly against the tube – if the tube is
depressed by about 10 mm (⅜ inch) this indicates that the pressure is approximately correct.
After the tube chambers have been inflated to the nominal pressure replace the valve caps. Fit the
caps to the valve body and turn clockwise until secure. Valve caps protect the valves from
accidental opening, provide a secondary seal and protect the valves from contamination.
FILL THE INFLATABLE KEEL WITH AIR UP TO THE RATED PRESSURE VALUE 0.15 BAR (2,15 psi).
Содержание ranger R380
Страница 1: ......
Страница 2: ...CONTENTS ...
Страница 3: ......
Страница 4: ...CONTENTS ...
Страница 30: ...OPERATING THE CRAFT 30 Fig 10 View of installed keel Fig 11 Floorboards installation Fastening elements ...
Страница 50: ...TECHNICAL DETAILS 50 GENERAL ARRANGEMENT OF A BOAT R380 Fig 26 General arrangement of a boat R380 ...
Страница 52: ...TECHNICAL DETAILS 52 GENERAL ARRANGEMENT OF A BOAT R420 Fig 27 General arrangement of a boat R420 ...
Страница 54: ...TECHNICAL DETAILS 54 GENERAL ARRANGEMENT OF A BOAT R460 Fig 28 General arrangement of a boat R460 ...
Страница 58: ...TECHNICAL DETAILS 58 LOADING PASSENGERS FOR R420 Fig 31 Recommended seating arrangement for 9 passengers ...
Страница 71: ...FOR YOUR NOTES ...
Страница 72: ......
Страница 73: ......