9
STEP 4: SIDE PANEL ATTACHMENT CONTINUED
Align the left and right panel so the knock out on the side of each panel is located toward the
upper front corner of the boiler. Install each side panel by sliding the front mounting holes over
the front tie rods. The back of the side panel can then be slid over the rear panel.
If installing a
7,8, or 9 section boiler, the extension side panels must be screwed to the boiler side
panels prior to mounting. Make sure the slotted holes on the extension side panels are
facing toward the back of the boiler.
Re-install the washers and nuts on the front tie rods and tighten. Secure the back of the side
panels to the rear panel with the sheet metal screws provided.
STEP 5: CONTROL SENSOR ATTACHMENT
Prior to jacket top and front panel installation the control sensor must be routed through the side
panel knock out. The boiler operating control can be mounted on either side of the boiler. Once
the control mounting side has been selected, remove the corresponding knockout, install the
plastic sensor protector and feed the sensor wire through the hole. Route the sensor wire over
the boiler insulation to the immersion well in the top rear section of the boiler. Make sure the
sensor bulb is fully inserted into the brass well and secure with the grommet provided.
Содержание Cast Iron Boiler Series
Страница 26: ...26 10 3 HYDROSTAT 3250 CONTROL Setting the control...
Страница 27: ...27...
Страница 30: ...30 12 0 EXPLODED PARTS VIEW...