5
TEMPERATURE DELTA
: 20°F
FLUE PIPE CONNECTION
CHIMNEY or Granby Direct Vent System (3, 4 & 5 section boiler only)
CLEANOUTS
Rear removable smoke hood & front combustion chamber swing door
FUEL
Not heavier than No.2 fuel oil
CAUTION:
Do not use gasoline, crankcase drainings, or any oil containing
gasoline.
ELECTRICAL
120 Volts, 60Hz, 15 amps. fuse or breaker
AIR SUPPLY
CAUTION: Adequate air supply for both combustion and ventilation must be available.
See page 20 for details.
3.0 UNIT INSTALLATION
The installation of the unit shall be in accordance with regulations of the authorities having
jurisdiction and be in accordance with CSA B139, NFPA31 and NFPA211.
3.1 PLACEMENT & LEVELING OF THE UNIT
The boiler should be located on a firm foundation in an easily accessible area that meets the
previously discussed clearances and air requirements. In situations where the floor may be
uneven the boiler may be leveled by the insertion of metal shims under the legs.
3.2 TRIM KIT COMPONENT INSTALLATION
If you purchased the “packaged” version of this boiler, the trim kit components and jacket have
been factory installed. Proceed to Section 3.2 – Step 8 – Control Mounting on page 11 of this
manual for remaining installation instructions.
If you purchased the “knockdown” version of this boiler, the trim kit components and jacket need
to be field installed following the instructions in sections 3.2 and 3.3.
Содержание Cast Iron Boiler Series
Страница 26: ...26 10 3 HYDROSTAT 3250 CONTROL Setting the control...
Страница 27: ...27...
Страница 30: ...30 12 0 EXPLODED PARTS VIEW...