19/37
GrainPro® Solar Bubble Dryer™50 Instruction Manual
MA4040RAD0914-9
Do not load the commodity to the pre-heating area within 1.5m from the ventilator.
Leave space of about 30cm on both sides of the drying floor that will serve as the side wall of the
SBD50.
5.5.3.
Use the rake mixer to spread the commodity
evenly on the drying floor.
NOTE:
Make sure the tool for spreading the
commodity does not have sharp edges
which may damage the drying floor.
5.6.
CLOSING
5.6.1.
After spreading the commodity evenly close
the drying area by completely zipping the
heavy-duty zipper around to connect the top
cover and the drying floor.
NOTE:
Opening is done in the opposite manner.
5.7.
FIXING WALL WITH SUPPORT LOOPS
5.7.1.
There are six (6) support loops which are
located at the SBD50 wall:
a.
Near the heating area
b.
At halfway length of the drying floor
c.
Near the exhaust port).
NOTE:
The use of the middle wall support loop
can be optional especially if the “Tube
mixer” will be used.
5.7.2.
Support the SBD50 by using a rope to tie the loops and peg it to the ground.
5.7.3.
This will prevent the SBD50 from being blown by sudden strong winds.
5.7.4.
On concrete pavement, it can be tied to a sandbag or any heavy stone or other heavy objects.
5.8.
VENTILATOR MANAGEMENT (SBD50-SOLAR AND SBD50-ELECTRIC)
5.8.1.
DAYTIME OPERATIONS (Ventilator running at
normal speed)- switch the toggle switch
upwards On.
5.8.2.
NIGHTTIME OPERATIONS (Ventilator running
at controlled speed using PWM)- switch the
toggle switch downwards On.