3.
Assembly of machinery
3.4
Assembly of the drain
The supplied emergency drain is to be
positioned on the discharge pipe. In the event
of an incident, this prevents sludge from being
flushed out of the system.
The discharge from the sampling is to be
directed from above into the emergency drain.
It may be necessary to shorten the discharge
pipe.
3.5
Assembly of the kit
The pre-mounted Klaro Easy kit is placed on the middle partition wall. The aeration
must extend to the
bottom of the tank. It should be ensured that the plate aerator
is located in the middle of the chamber. It
may be necessary to readjust the plate accordingly by turning the horizontal pipe.
The sampling container is to be filled with water. The uplift of the kit is prevented by the own weight of the
filled sampling container. Further fixing of the kit is therefore unnecessary.
Schlamm-
speicher/
Puffer
(AS)
SBR-
Reaktor
Pre-
treatment/
Sludge
storage
SBR
reactor