1.
Installation and assembly
The installation of the tank must follow the directions in the enclosed installation instructions.
These instructions also contain further information on the installation conditions for the tanks and how to
connect up the infeed and overflow lines.
The emergency overflow should be fitted during assembly of the dividing wall, see section 3.1.
During the operation of a wastewater treatment system unpleasant odour may arise. The location of the
wastewater treatment system should not be chosen close to the living area (patio, windows on buildings,
etc.).
A ventilation as described in section 6 is absolutely necessary to avoid odour nuisance as far as possible.
2.
Dimensions
Schlamm-
speicher/
Puffer
(AS)
SBR-
Reaktor
L
H
s
H
p
H
W
g
e
s
E
H
H
B
B
,m
in
H
B
B
,m
a
x
A
E
*
B
Tank
2700 l
3750 l
4800 l
6500 l
Inhabitants
5 Inhab.
8 Inhab.
10 Inhab.
14 Inhab.
Total volume
2700 l
3750 l
4800 l
6500 l
Length
L
2080 mm
2280 mm
2280 mm
2390 mm
Width
W
1565 mm
1755 mm
1985 mm
2190 mm
Height
H
2010 mm/
1680** mm
2200 mm/
1870** mm
2430 mm/
2100** mm
2710 mm/
2380** mm
Min. Water level SBR
H
BB,min
850 mm
960 mm
1130 mm
1310 mm
Max. Water level
H
BB,max
1010 mm
1180 mm
1370 mm
1600 mm
Max.
Water
level
for
primary treatment
HW
tot
1100 mm
1280 mm
1480 mm
1750 mm
Height buffer storage
H
P
350 mm
430 mm
480 mm
600 mm
Height sludge storage
H
S
750 mm
850 mm
1000 mm
1150 mm
Inflow
E
515 mm/
205** mm
515 mm/
205** mm
515 mm/
205** mm
515 mm/
205** mm
Inflow *
E*
750 mm/
430** mm
750 mm/
430** mm
835 mm/
515** mm
855 mm/
535** mm
Outflow
A
755 mm/
435** mm
755 mm/
435** mm
840 mm/
520** mm
860 mm/
540** mm
* alternative inflow height is possible
** with MINI telescopic dome shaft
Depending upon local conditions, the inflow can be either on the tank dome or on the tank at the front.
Pre-
treatment/
Sludge
storage
SBR