
www.graf.info
16 / 45
3.
Assembly of machinery
3.2
Position of emergency overflow and outlet pipe
The position and location of the outlet pipe depends on the position of the baffle. The distance between
the baffle and the beginning of the straight outlet pipe is 430 mm. The baffle spot is the outer surface of
the top central lying rip. At the installation the emergency overflow has to be pushed about 60 mm onto
the outlet pipe.
430
Notüberlauf
KG Ablauf-
rohr
Trennwand
Schlamm-
speicher/
Puffer
(AS)
SBR-
Reaktor
A
430
3.3
Final assembly of the ventilation apparatus
Remove the Klaro Easy installation kit from
the packaging and screw the short stainless
steel tube (length 350 mm) on to the
stainless steel 90° elbow on the down pipe.
Then carefully screw the disc aerator into the
thread provided until hand-tight. Please note
that all threads must be wrapped with Teflon
tape, see illustration.
Montage disc aerator
Seal all threads with
Teflon tape!
down pipe
Disc diffuser
Tighten plastic
thread until
hand-tight
Pre-
treatment/
Sludge
storage
SBR
reactor
Baffle
KG outlet pipe
Emergency
overflow
Содержание 107437
Страница 47: ...Notizen Notes Notas ...