Operation
Operation
Operation
Pressure
Pressure
Pressure Relief
Relief
Relief Procedure
Procedure
Procedure
Follow the Pressure Relief Procedure
whenever you see this symbol.
This equipment stays pressurized until
pressure is manually relieved. To help prevent
serious injury from pressurized fluid such as
splashing fluid and moving parts, follow the
Pressure Relief Procedure before cleaning,
checking, or servicing the equipment.
1. Close the agitator shut-off valve.
2. Shut off the air supply to any accessories
such as feed pumps or an elevator.
Setup
Setup
Setup
To reduce the risk of serious injury from
moving parts and splashing fluid, always shut
off the agitator before you raise, check, or
repair the agitator.
1. Before turning on supply air, make sure all
valves are in the CLOSED or OFF position.
a. For elevator packages, make sure that
the elevator control selector is in the OFF
position.
b. Make sure that the agitator shut-off
valve is CLOSED.
c. If using a feed pump, make sure that the
pump shut-off valve is CLOSED.
2. Turn on the air supply to the system.
FP
WWLL EE
$$
55
(( &&
S A
// %%
55 **
$$ 66
O
FF
RUN
RAIS
E
NN
Ref.
Ref.
Ref.
Description
Description
Description
AR
Air Restrictor (Elevator Speed)
EC
Elevator Control Selector
AS
Agitator Shut Off Valve
FP
Feed Pump Shut Off Valve
SA
Supply Air Inlet
LB
Agitator Lubricator
RG
Agitator Regulator and Gauge
3A4032D
13