Assembling
Assembling
Assembling and
and
and Positioning
Positioning
Positioning the
the
the
Agitator
Agitator
Agitator
To reduce the risk of fire and explosion,
always maintain a minimum of 1 in. clearance
inside the material drum between rotating
agitator parts and any other objects, including
the drum to prevent sparks from contact. This
includes the edges of the drum as well as any
item which may be inserted into the drum
from another opening, such as feed pumps
or suction tubes.
With
With
With an
an
an Elevator
Elevator
Elevator
To reduce the risk of injury from being
crushed by equipment, do not go under the
elevator when it is raised.
Mount the drum cover as described in the
Elevators and Pump Supports Manual 306287.
The elevator must be in the down position when
you do any work on the elevator, agitator, or
drum cover assembly.
Without
Without
Without an
an
an Elevator
Elevator
Elevator
When included in a package without an elevator,
the drum cover is provided with handles for easy
lifting and positioning. For additional handles,
order the Handles Kit, part 237524.
Place two standard 55 U.S. gallon (45 Imperial
gallon, 200 L) drums 14 in. (36 cm) apart, and
center the drum cover on the barrels.
1. Install the four lock nuts (A2) holding the
agitator to the drum cover.
2. Tighten the lock nuts to 30 ft-lb (40.6 N
•
m).
3A4032D
9