Change
Change
Change Pail
Pail
Pail
1.
Turn off pump air supply by pushing the air motor
slider valve (BH) to the off position.
2.
Raise the platen out of the pail:
NOTE:
NOTE:
NOTE: When raising the ram, the pail must be
pushed off of the platen by use of the blowoff
button (BG). When the blowoff button (BG) is
pushed, the air supply raising the ram is diverted
to the blowoff connection on the platen and
creates a pressure to push the pail off of the
platen. If the ram director valve (BD) is not in the
up (raise ram) position, the blowoff button (BG)
has no functionality.
a.
Move the director valve handle (BD) to the
UP position.
b.
As the ram raises the pail off of the base,
periodically press the blowoff button (BG) to
create a pressure in the pail to push it off of
the platen.
c.
When the platen is free of the pail and the
ram reaches its full height, move the director
valve handle (BD) to the neutral position.
3.
Remove the empty pail.
4.
Inspect platen and, if necessary, remove
any remaining material or material
build-up. If full cleaning is necessary, see
5.
To empty another pail, perform the steps of
Pump
Pump
Pump Shutdown
Shutdown
Shutdown
At the end of the work shift, after any
necessary flushing, and before you check,
clean, adjust, or repair the system, follow the
Pressure Relief Procedure, page 8
. Always stop the
pump at the bottom of its stroke to prevent fluid from
drying on the displacement rod. (The air motor will
exhaust at the bottom or top of the stroke.)
Turn off the air supply shutoff valve (W).
3A5400B
9
Tel: 866-777-6060
Fax: 866-777-6383
Springer Pumps, LLC
Website: www.springerpumps.com
Int'l: +001 267 404 2910