Operation
22
3A2152B
g. Set the INHIBITOR PERCENT OF MIX to 6%.
h. Set the CATALYST PERCENT OF MIX to 0%
or 1%.
i.
Set the COLOR PERCENT OF MIX to the
desired percent.
j.
Verify the TOTAL PERCENT (REF) is 100%
k. Press and hold the footswitch down. All pumps
will start to dispense.
l.
When the base pump hits the end travel
released the footswitch; all pumps will reload.
m. When the pumps are reloaded, repeat this
about fifteen times to verify the volume of the
mixer has color through the mixer and the mate-
rial coming out is air-free.
Содержание LSR Select
Страница 7: ...Important Two Component Material Information 3A2152B 7...
Страница 50: ...Parts 50 3A2152B Base Pump Wet Section 24L880 ti18115a 201 202...
Страница 54: ...Parts 54 3A2152B Base Pump Inlet Outlet Valves 24L977 ti18117a 405 407 407 403 408 402 404 409 406 401...
Страница 60: ...Parts 60 3A2152B Valve Stack 24L893 ti18160a 704 706 708 703 702 701 705 707 709 712 711 710...
Страница 83: ...Control Schematics 24L890 3A2152B 83...
Страница 90: ...Appendix A HMI Screens Overview 90 3A2152B Drive Valve Control Screen Standard Drive Valve Control Screen...
Страница 93: ...Appendix A HMI Screens Overview 3A2152B 93...
Страница 111: ...Accessories 3A2152B 111...