Kits and Accessories
333586D
87
NOTE:
Do not install the recirculation hose (607) onto
the platen valve fitting (603) until material has been
loaded into the platen valve (601). See the E-Flo iQ
Operation manual for instructions to load material into
the platen and platen valve.
9. Unplug the existing M12 connector from port 3 on
the Electric Driver (AB).
10. Connect the harness (609) to port 3 on the Electric
Driver (AB).
11. The harness (609) has an M8 connector and an
M12 connector. Connect the M12 connector that
was originally connected to port 3 on the Electric
Driver (AB) to the M12 connector on the harness
(609). Connect the M8 4 pin connector to the
solenoid on the platen valve (601).
12. Remove the 1/4 NPT plug from the Integrated Air
Controls (AG). See
Integrated Air Controls (AG)
on page 15.
13. Insert the elbow fitting (611) into the Integrated Air
Controls (AG).
14. Connect the nylon tube (610) to the elbow fitting
(611) and the platen valve (601).
NOTE:
Make sure the pins on the solenoid valve cable
are oriented as shown in F
IG
. 71 before the cable is
plugged into the solenoid valve.
F
IG
. 69
609
610
609
M8
Connector
M12
Connector
F
IG
. 70
F
IG
. 71
611
610
Solenoid Valve
Solenoid Valve
Cable
Содержание E-Flo iQ Dispense System
Страница 95: ...Wiring Diagrams 333586D 95 Wiring Diagrams ...
Страница 96: ...Wiring Diagrams 96 333586D ...
Страница 97: ...Wiring Diagrams 333586D 97 ...
Страница 98: ...Wiring Diagrams 98 333586D ...
Страница 99: ...Wiring Diagrams 333586D 99 ...