Setup
3A6941J
17
4. Connect the supply hose (JJ) between the remote
fill station pump (AA) and fill coupler (FC) port
marked with an “I” (F
. 15).
5. Start the remote fill station pump (AA).
6. When the tank (K) is filled:
• The remote fill station pump (AA) stalls
(dead-heads),
• the auto-fill shut off pin (v2) pops up as shown
in F
. 16,
• The pressure gauge needle rises to the fill
pump’s set pressure.
Note: If the pump does not stall (dead-head) there is a
leak in the system.
NO
7. Turn off the remote fill station pump (AA).
8. Pull and hold the fill valve pressure relief knob (FF)
long enough to relieve line pressure between fill
valve (EE) and Auto-fill Shut Off Valve (V) and
between remote fill station pump (AA) and fill valve
(EE).
Note:
The length of time it takes to vent the pressure
varies depending on the system design and installation.
In some installations it may be necessary to repeat Step
8 to ensure pressure is relieved.
9. Disconnect the supply hose (JJ) from the fill coupler
(FC) (F
10. Replace the dust cover (DC) over the fill coupler
(FC).
NOTICE
To prevent damage to the unit:
• Check breather (J) vent for proper operation
before filling the tank (K).
• Do not fill tank (K) beyond the overflow port (H).
• Do not use the breather (J) as a port to fill the tank.
F
IG
. 16
V2
Содержание Dyna-Star 3A6941J
Страница 11: ...Installation 3A6941J 11 Typical Wiring Single Line Parallel Systems FIG 7...
Страница 30: ...Maintenance 30 3A6941J 35 Remove the check valve and o ring 37 FIG 49 FIG 49 37...
Страница 44: ...Parts 44 3A6941J 43 42 41 58 59 52 55 56 57 54 47 48 49 50 51 53...
Страница 51: ...Mounting Dimensions Stand Alone Pump 3A6941J 51 Mounting Dimensions Stand Alone Pump...