310528
13
Installation
The installation procedure includes:
D
locating and installing the ram
D
electrically connecting hoses to the electrical con-
trol panel
D
grounding the system
D
connecting the electrical control panel to a power
source
D
checking resistance
D
setting controls on the electrical control panel
D
starting up the system
D
initially loading material
Locating the Ram
To locate the ram, follow one of the procedures below.
Refer to the Ram Mounting and Clearance Dimensions
drawings on page 78 for ram mounting and clearance
dimensions.
Bolting the Ram to the Floor
To install the ram in a permanent location:
1. Select a convenient location for the equipment.
Check that there is sufficient overhead clearance
for the pump and ram when the ram is in the fully
raised position. Make sure the air regulators for the
pump and ram are fully accessible.
2. Level the base of the ram, using metal shims.
3. Using the holes in the base as a guide, drill holes
for 1/2 in. (13 mm) anchors.
4. Bolt the ram to the floor anchors, which must be
long enough to prevent the unit from tipping. Refer
to the Dimensional Drawings starting on page 76.
Securing the Ram to a Mobile Platform
When performing the following procedure, use the
Mobile Platform Kit (918414) to secure the ram to a
mobile platform.
To install the ram on a mobile platform:
1. Brace the platform so it remains stationary while
you attach the ram to the platform.
2. Place the ram on the platform and line up the
holes in its base with the holes in the platform.
3. Secure the ram to the platform with the provided
nuts and bolts.
Electrically Connect Hoses to the
Electrical Control Panel
Assemble the hose and gun components as needed.
For information on connecting the hose and gun com-
ponents, follow the gun’s instructions.
Electrically connect the hoses to the electrical control
panel. The connector is are located on the back of the
electrical control panel.
Connect the plug from hose 1 to the Hose 1/Gun 1
receptacle. Refer to page 64 for connecting the hose
to a 3-zone panel, or to page 65 for connecting the
hose to a 4-zone panel.
Содержание 918334
Страница 12: ...12 310528 Notes...
Страница 36: ...36 310528 Service Fig 10 240 Volt Ram Plate Assembly Wiring 9599A 3L1 3L2 3L3 5L1 5L2...
Страница 37: ...310528 37 Service Fig 11 To Ram Junction Box 3L1 3L2 3L3 5L1 5L2 5L3 480 575 Volt Ram Plate Assembly Wiring...
Страница 40: ...40 310528 Notes...
Страница 44: ...44 310528 Notes...
Страница 52: ...52 310528 Notes...
Страница 65: ...310528 65 Parts Models 617349 480 VAC and 617485 240 VAC 4 zone Electrical Control Panel exterior...
Страница 67: ...310528 67 Schematics Electrical Control Panel and Wiring Parts and Description 617300 Page 1 9604A...
Страница 68: ...68 310528 Schematics 617300 Page 2 9605A...
Страница 69: ...310528 69 Schematics 617485_1 9606A...
Страница 70: ...70 310528 Schematics 617485_2...
Страница 71: ...310528 71 Schematics 617484 Page1 9608A...
Страница 72: ...72 310528 Schematics 617484 Page2 9609A...
Страница 73: ...310528 73 Schematics 617349 Page1 9689A...
Страница 74: ...74 310528 Schematics 617349 Page 2 9690A...
Страница 84: ...84 310528 Appendix New Style Temperature Controller Settings List...