![Graco 24T918 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/graco/24t918/24t918_instruction-manual_2252663018.webp)
Setup
18
333347F
2.
Place the base system in the desired operating
location and orientation. See
•
The bottom of the electrical enclosure has holes for
securing the InvisiPac system to a surface. The
holes are accessible through the bottom access
doors in the three rear walls of the electrical enclo-
sure.
•
To install the InvisiPac system in place of a
non-Graco hot melt system,
purchase
. See installation instructions on
page 102.
•
To raise the system to eye-level,
purchase
. See installation instructions on
page 102.
NOTE:
Supplied vacuum transfer hose must reach from
the system to the adhesive pellets container. Supplied
heated hose must reach from system to applicator(s).
3.
Adjust the funnel inlet:
a.
Remove plug (23) and insert the provided 5/16
in. nut driver (92) through the access hole in the
back of the system. Loosen the band clamp (81)
two turns.
b.
Rotate the funnel inlet (G3) and re-tighten the
band clamp (81).
4.
Insert 1.3 in. (33 mm) OD clear vacuum transfer
hose (G2) into vacuum transfer funnel (G3) inlet and
secure with supplied hose clamp. The hose clamp
should be placed over the cutouts in the funnel inlet
where it can firmly hold the transfer hose. See F
5.
Connect the long supplied 3/8 in. OD air line (G4) to
the 3/8 in. push-to-connect fitting on the air line from
the system. See F
. 9.
F
IG
. 8: Lifting Strap
WLD
F
IG
. 9
WLD
G3
23
92
81
WLD
G3
G2
G4
Содержание 24T918
Страница 16: ...Component Identification 16 333347F ...
Страница 103: ...Accessories 333347F 103 ...
Страница 129: ...Technical Data 333347F 129 ...