NOTICE
NOTICE
NOTICE
Be sure to keep 48 volt cables isolated from the
low voltage wiring. All 48 VDC wiring must use
the right-hand wireway (X) inside the electrical
control box. Use grommet (Y) marked in Figure
9 to install the Pump Expansion Kit wiring.
Figure 10 48 VDC Grommet and Wireway
5.
The PD2K/PD1K fluid panel cover was previously
removed in
. Thread
the 2–wire cable (22) through the grommet (42)
on the bottom of the fluid panel and up into
the electrical box through an existing grommet
and the wireway. Connect the cable (22) to the
appropriate terminals on the top of the 48 VDC
power supply: P1 for Pump 1 and P2 for Pump
2 (PD1K only); P3 for Pump 3, P4 for Pump 4.
Connect the red wire to + terminal, black wire to
- terminal.
Figure 11 48 VDC Power Supply Connection
Points
6.
Install the dual grommet (11, shipped loose) on
the free end of the D-SUB cable (8).
7.
Fasten the grommet (11) to the side of the
electrical control box, using two screws (31).
8.
Reinstall the covers on the PD2K electrical
control box and on the fluid panel.
332456D
17