
47
3. Aim at and measure the end point of the baseline.
then defining baseline is over.
【
Procedure of point projection
】
Pt.project(end)
Vz:
83
°
09' 38"
HR:
24
°
30' 08"
SD:
6.408m
HD:
6.362
Meas T.H. Mode Enter
Survey(Pt.project)
HR:
15
°
23' 50"
X:
-0.903m
Y:
-0.867
Z:
-0.099
Meas T.H.
Mode
Survey(Pt.project)
HR:
15
°
23' 50"
SD:
0.867m
HD:
0.867
Meas T.H.
Mode