PCD Pump User Guide
Maintenance
2/20/19
GPD Global
®
21
9- Reassemble Pump
To reassemble the pump:
1. Perform
8- Clean Seal Housing
(pg 20) in reverse order.
2. Do not exceed tightening torque specified below while performing
7- Clean Dispenser
Housing & Rotor
(pg 20) in reverse order.
3. Perform
6- Remove & Clean Feed Way
(pg 14) in reverse order.
4. Install the stator according to
B- Insert Stator
(pg 9)
5. Connect the dispensing unit to the drive unit per
C- Connect Dispense Unit to Drive Unit
(pg 10).
Pump Model
Maximum Tightening Torque
PCD4
PCD4L
PCD4H
0.35 Nm
PCD6
PCD7
0.5 Nm