PCD Pump User Guide
Operations
2/20/19
GPD Global
®
9
B- Insert Stator
PCD3, PCD3L, PCD3H
To attach the stator
for the first time
:
1. Unscrew the union ring (Item 2) from the dispenser housing (19).
2. Remove the stator cover (Item Q) and set aside.
3. Wet the rotor (Item C) with the medium to be used or a suitable lubricant.
4. Screw the stator (Item 7) onto the rotor (Item C) until it reaches the limit on the body (Item
19). There will be approximately 1 mm between the end of the stator and the threads of
the dispenser housing.
5. Place the stator cover (Item Q) over the stator (Item 7) and install the union ring (Item 2),
firmly clamping the two pieces together.
PCD4, PCD4L, PCD4H, PCD4HB, PCD6, PCD6HB, PCD7H
To insert the stator
for the first time
:
1. Unscrew the union ring (Item 18), and then slide both the union ring and threaded sleeve
(Item 21) away from dispenser housing (Item 15).
CAUTION:
DO NOT assemble the pump dry. There is a danger of damage to the pump if it is
run dry. Even a brief period of dry run time can lead to the destruction of the stator.
CAUTION:
DO NOT assemble the pump dry. There is a danger of damage to the pump if it is
run dry. Even a brief period of dry run time can lead to the destruction of the stator.