14 GMC-I Messtechnik GmbH
5.6.3.
All Types of SMARTCONTROL After Mounting
Tip:
See the “Connections Overview,” in section 6. and other instructions in this manual regarding
connection options.
Note:
►
Retighten all screws and fasteners after installation has been completed.
►
Green connector plugs for the various inputs (analog, temperature, digital) are located on
the PCB. Wires with cross-sections of up to 1.5 square mm can be connected.
Warning:
►
Insulation testing must be executed in accordance with VDE. Do not expose components
which are not voltage-proof to high voltages during testing.