
OM−05229
JSV3H
PAGE A − 2
SAFETY
pump, and so that the load will be bal-
anced.
After the pump has been installed, make
certain that the pump and all piping or
hose connections are secure before op-
eration. Loose connections can result in
damage to equipment and serious inju-
ry to personnel.
If this pump is used to handle sewage,
take necessary precautions during
maintenance and repair to prevent per-
sonal contamination which could result
in illness.
The following precautions should be
taken before attempting to open or ser-
vice the pump; otherwise, injury or
death could result.
1. Lock out the power to the control pan-
el to ensure that the pump will remain
inoperative.
2. Allow the pump to completely cool if
over heated.
3. Close the discharge valve (if used).