8
13
1. UNCOIL CABLE TO BE INSTALLED AND LAY IN
A STRAIGHT LINE ON THE FLOOR.
2. PASS A SHORT SECTION OF ANCHOR CABLE
THROUGH DRIVE ARM.
3. SLIDE CABLE CONNECTORS TOGETHER AND
FASTEN BOTH CAP SCREWS.
4. DRIVE ARM MUST TURN COUNTER
CLOCKWISE (FACING MACHINE) WHEN
STARTING TO INSTALL CABLE.
5. LAY OUTER CABLE TURNS BY HAND TO FILL
REEL PROPERLY.
6. START MACHINE.
7. FEED REMAINING CABLE INTO REEL.
8. STOP MACHINE OCCASIONALLY TO CHECK
DISTRIBUTION AND REPOSITION CABLE IF
NEEDED.
9. ATTACH CUTTING TOOL OF YOUR CHOICE.
IF YOU ARE USING OUR POWER CABLE FEEDER AND PULLER, DO NOT ALLOW TO PASS
ANY CABLE ENDS OR CABLE CONNECTORS THROUGH FEEDER, AS IT MAY DAMAGE IT.
8
13
HOW TO INSTALL A NEW CABLE
MODEL GO 68HD, GO 68, GO 62 SERIES
MODEL GO 50 SERIES
1. UNCOIL CABLE TO BE INSTALLED AND LAY IN
A STRAIGHT LINE ON THE FLOOR.
2. MAKE SURE DRIVE ARM ROTATES FREELY.
3. FEED CABLE WITH INSTALLED CABLE END
THROUGH DRIVE ARM.
4. SCREW CABLE END INTO REEL CONNECTOR.
5. FASTEN REEL CONNECTOR TO REEL WITH
BOLT.
6. DRIVE ARM MUST TURN COUNTER
CLOCKWISE (FACING MACHINE) WHEN
STARTING TO INSTALL CABLE.
7. LAY OUTER CABLE TURNS BY HAND TO FILL
REEL PROPERLY.
8. START MACHINE.
9. FEED REMAINING CABLE INTO REEL.
10. STOP MACHINE OCCASIONALLY TO CHECK
DISTRIBUTION AND REPOSITION CABLE IF
NEEDED.
11. ATTACH CUTTING TOOL OF YOUR CHOICE.
MODEL GO 380/250 SERIES, GO 15
1. UNCOIL CABLE TO BE INSTALLED AND LAY IN
A STRAIGHT LINE ON THE FLOOR.
2. MAKE SURE DRIVE ARM ROTATES FREELY.
3. FEED CABLE THROUGH DRIVE ARM.
4. DRIVE ARM MUST TURN COUNTER
CLOCKWISE WHEN INSTALLING CABLE.
5. START MACHINE.
6. FEED REMAINING CABLE INTO DRUM
ALLOWING ADEQUATE LENGTH OF EXPOSED
CABLE TO ATTACH FLEXIBLE LEADER
(ELEPHANT TRUNK) WHEN APPLICABLE.
7. INSTALL CABLE END AND CUTTING BLADE
(AVAILABLE ONLY FOR 3/8” DIA. CABLE) AND/
OR MAKE CABLE BENDS OF YOUR CHOICE.
Gorlitz Operating & Maintenance Manual 8