9 58 "
27 18 "
1 11
16 "
1 11
16 "
1"
1"
2 X 4 X 70"
DECK SUPPORT
9 58 "
27 18 "
1 34 "
1 34 "
1"
1"
2 X 6 X 70"
FRONT FACE BOARD
STEP 3A: DRILL HOLES FOR BRIDGE CHAINS
1: LOCATE ONE 2 X 4 X 70" DECK SUPPORT AND ONE 2 X 6 X 70" FRONT FACE BOARD.
2: MEASURE AS SHOWN BELOW AND MAKE MARKS ON EACH BOARD.
3: PLACE A SCRAP PIECE OF WOOD UNDER THE BOARD BEFORE YOU DRILL THE 1" HOLES
WITH A SPADE BIT.
43
Содержание Wilderness Gym II 1500JWF
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 44: ...PICTURE DESCRIPTION QTY ROPES SLIDE WAVE 3 1 1 13 ROPE LADDER 2 TRAPEZE BAR W CHAINS SWING W CHAINS 34 ...
Страница 46: ...PICTURE DESCRIPTION QTY IRON DUCTILE SWING HANGERS 11 4012 TELESCOPE 07 0040 10 ROCK WALL ROPE 6 1 1 36 ...
Страница 106: ...PART 2 CLATTER BRIDGE ASSEMBLY 96 ...
Страница 139: ...APPENDIX 128 ...
Страница 141: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...
Страница 142: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY ...
Страница 143: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...