16" TOP OF TOP RAIL
TO BOTTOM OF
LOWER RAIL
STEP 16: MOUNTING BRIDGE RAILS TO FORT
1: PLACE THE BRIDGE RAILS AGAINST THE GREEN CORNER POST AND CENTER POST ON
THE PLAY SET.
2: LEVEL EACH TOP BRIDGE RAIL AND ATTACH THEM TO THE CORNER POSTS WITH 5/16" X
3-1/2" LAG SCREWS AND 5/16" WASHERS.
3: ATTACH EACH LOWER BRIDGE RAIL TO THE CORNER POSTS USING THE 16" DIMENSION
AT THE FORT AS SHOWN ON STEP 15 AND BELOW. ATTACH EACH LOWER BRIDGE RAIL
WITH 5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS.
5/16" X 3-1/2" LAG SCREW
TOP BRIDGE RAIL
LOWER BRIDGE RAIL
5/16" WASHER
59" CORNER POST TO CORNER POST
112
Содержание Wilderness Gym II 1500JWF
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 44: ...PICTURE DESCRIPTION QTY ROPES SLIDE WAVE 3 1 1 13 ROPE LADDER 2 TRAPEZE BAR W CHAINS SWING W CHAINS 34 ...
Страница 46: ...PICTURE DESCRIPTION QTY IRON DUCTILE SWING HANGERS 11 4012 TELESCOPE 07 0040 10 ROCK WALL ROPE 6 1 1 36 ...
Страница 106: ...PART 2 CLATTER BRIDGE ASSEMBLY 96 ...
Страница 139: ...APPENDIX 128 ...
Страница 141: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...
Страница 142: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY ...
Страница 143: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...