REPEAT THE
MEASURE/MARK/DRILL
PROCESS ON THE
INSIDE OF THESE
CORNER POSTS.
USE 1-7/8"
FOR GREEN POSTS.
STAINED
16
1"
POSTS
"
1"
1 13
33 38 "
33 7
16 "
STEP 23: DRILLING CORNER POST HOLES
1: CHECK THE DIMENSION OF THE ROOF SUPPORT ASSEMBLIES AS SHOWN BELOW BEFORE
DRILLING HOLES.
2: MEASURE AS SHOWN BELOW AND MAKE MARKS ON THE CORNER POSTS ON THE
INSIDE.
3: DRILL A 9/64" HOLE BY 2-1/2" DEEP AT EACH MARK.
4: REPEAT SUBSTEPS 2-3 ON THE INSIDE OF THE OTHER POSTS
AS POINTED OUT BELOW.
119
Содержание Wilderness Gym II 1500JWF
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 44: ...PICTURE DESCRIPTION QTY ROPES SLIDE WAVE 3 1 1 13 ROPE LADDER 2 TRAPEZE BAR W CHAINS SWING W CHAINS 34 ...
Страница 46: ...PICTURE DESCRIPTION QTY IRON DUCTILE SWING HANGERS 11 4012 TELESCOPE 07 0040 10 ROCK WALL ROPE 6 1 1 36 ...
Страница 106: ...PART 2 CLATTER BRIDGE ASSEMBLY 96 ...
Страница 139: ...APPENDIX 128 ...
Страница 141: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...
Страница 142: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY ...
Страница 143: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...