GVC-2200-V Operation & Maintenance Manual
4.4 Control
Panel
GVC-2200-V
on/off
heating
ready
fill service
volume
1
2
3
4 5
6
7
1.
Power switch (
on/off
)
2.
Heating
switch
3.
Control light -
ready
(green): steam pressure OK
4:
Control light -
fill
(amber): refilling the canisters
5.
Control light –
service
(red): overheating/malfunction
6. Steam
volume
regulator
7.
Pressure gauge (steam)
4.5. Power supply/switching on the GVC-2200-V
a.
ENSURE THAT ON/OFF AND HEATING SWITCHES ARE IN ‘OFF’ POSITION
(‘
O
’ IS VISIBLE ON BOTH SWITCHES).
b.
Connect the power cable plug into a suitable power supply socket (the required
power supply is indicated on the rear of Goodway’s Vapor-Steam Cleaner).
THE
GVC-2200-V MUST BE GROUNDED
. See 2.4.2. Should an extension power
cable be required, ensure it is rated at 20 amps and not more than 50 feet in
length, fully uncoiled.
c.
Plug in at the power supply socket. Then
switch on only the (left) main ‘on/off’
switch
on the
GVC-2200-V
.
d.
The water pump will automatically pump up to one (1) gallon of water from the
water canister into the boiler*. After the pump cycles, typically after approximately
15 seconds, push the
Heating
switch on.
e.
After about 10 - 12 minutes the maximum working pressure is achieved in the
boiler and the green control (
Ready
) light shows.
*The GVC-2200-V is delivered without water in the boiler, the first time it is operated
may take longer for the pumping to cease, after which please remove the stick-on
warning label from the heating switch before operating.
f.
Turn the steam
volume
regulator counter-clockwise to maximum.
g.
Operate the steam switch on the pistol-grip (red button) to clear the hose of air for
approximately 15 seconds. The steam gauge will indicate pressure reduction, and
GVC-2200-VVAC
Page 8 of 16
August 22, 2002