Goodman ASASD-10 Скачать руководство пользователя страница 3

 

 

area where they are attracted to a series of grounded 
plates. Pollutants are held in this section like a magnet 
until washed away during cleaning. Lastly, clean air 
passes over 

activated carbon filters (3) 

for odor removal. 

The Electronic Air Cleaner, available in four models 

with air flow capacities of up to 1200, 1400 and 2000 
CFM (2040, 2380 and 3400 m³/hr), is adaptable to all 
residential forced air heating or cooling systems. 

 

COMPONENTS 

Cabinet:

  Constructed of heavy gauge galvanized steel 

to resist corrosion and provide trouble-free installation. 
Holes are provided to facilitate mounting to the ductwork 
or air handling equipment. 

Power Box:

  Removable. Contains the power switch, 

performance indicator light, safety interlock switch, high 
voltage power board, air proving switch and high voltage 
contacts. 

The power board is uniquely equipped with a variable 
resistor (potentiometer) to adjust high voltage output. 
Output has been pre-set for optimum efficiency. As 
voltage varies in extreme conditions of dryness, humidity 
or proximity to hydro towers, raising or lowering 
potentiometer allows for proper voltage output. 

Air Proving Switch (APS): 

 Integrated. Automatically 

cycles Air Cleaner on and off with the system fan. The 
 

APS will detect airflow (fan on) and energize the Air 
Cleaner. 

Collecting Cells:

  Consist of an ionizing section and a 

plate section. The arrow on the cell must point toward the 
system fan. 

Prefilters:

  Constructed of aluminum mesh, to prevent 

lint and large particles from entering the collecting cells. 

Carbon Filters:

  Remove odors. Must be replaced every 

six months - not washable. Maximum of (3) carbon filters 
can be used at same time. 

 

INSTALLATION 

Static Pressure 

The static pressure drop across the Air Cleaner will 

vary with CFM and whether the optional carbon filters 
have been installed in the unit.  

Location 

The Air Cleaner must only be installed in the return 

air duct, as close to the fan compartment as possible. 
This location provides the most even airflow across the 
collecting cells and allows the Air Cleaner to keep the 
system motor and blower clean. The installation can be 
vertical or horizontal. When choosing a location, there 
must be adequate room to wire the Air Cleaner and 
remove prefilters, collecting cells and power box for 
maintenance. 

Note: 

 Once Air Cleaner has been installed, do not allow 

the placement of any device such as a new hot water 
heater, water softener, gas pipe, or electrical cable to be 
put 2 ft. in front of or within 6 in. (15 cm) from top of Air 
Cleaner, in order to allow removal of filters and Air 
Cleaner parts, which are necessary for maintenance or 
servicing. 

Table 1 — SPECIFICATIONS 

MODEL 

GSASD-10 

GSASD-11 

GSASD-12 

GSASD-18 

House Size Area 

<2400 ft² 

<222.96 m² 

<3000 ft² 

<278.70 m² 

<3000 ft² 

<278.70 m² 

>3000 ft² 

>278.70 m² 

Airflow 

up to 1200 CFM 

up to 2040 m³/hr 

up to 1400 CFM 

up to 2380 m³/hr 

up to 1400 CFM 

up to 2380 m³/hr 

up to 2000 CFM 

up to 3400 m³/hr 

Duct Size 

16 x 20 in 

40.5 x 51.0 cm 

16 x 25 in 

40.5 x 63.5 cm 

20 x 20 in 

51.0 x 51.0 cm 

20 x 25 in 

51.0 x 63.5 cm 

Unit Weight 

35 lbs 

15.9 kg 

37 lbs 

16.8 kg 

37 lbs 

16.8 kg 

41 lbs 

18.6 kg 

Input Voltage 

120 V  60 Hz 

120 V  60 Hz 

120 V  60 Hz 

120 V  60 Hz 

Power Consumption 

30 Watts 

30 Watts 

30 Watts 

30 Watts 

Upgrades Included 

Carbon Filters 

Air Switch 

Carbon Filters 

Air Switch 

Carbon Filters 

Air Switch 

Carbon Filters 

Air Switch 

100% Air Flow 

No Carbon 

100% Air Flow 

With Carbon 

40% Air Flow 

No Carbon 

40% Air Flow 

With Carbon 

0.158 0.250 0.030  0.060 

Table 2 — Pressure Drop (Inches WC) 

 

Power Box 

Cabinet 

Door 

Performance Indicator Light 

ON/OFF Switch 

Collecting Cells (2) 

Activated Carbon 
Filters (3) 

Prefilters (2) 

Fig. 2 

Содержание ASASD-10

Страница 1: ...ruses and more down to 0 01 micron Dual Voltage Aluminum Collecting Cells are durable and easy to maintain Cell Guide ensures proper placement of collecting cells Activated Carbon Filters remove unple...

Страница 2: ...of electrostatic precipitation Millions of airborne pollutants are carried through the return air ducts of the heating cooling system and treated through four stages of filtration The prefilters 2 re...

Страница 3: ...oss the Air Cleaner will vary with CFM and whether the optional carbon filters have been installed in the unit Location The Air Cleaner must only be installed in the return air duct as close to the fa...

Страница 4: ...pe humidifier must be installed as far from the Air Cleaner as possible 2 Collecting cells must be washed frequently to prevent a mineral deposit build up Installation Location With Air Conditioner Wh...

Страница 5: ...ent direction than the left to right set up The handle should face the door Close access door Wiring Wiring should only be performed by qualified personnel only All wiring must comply with all applica...

Страница 6: ...non chlorine non corrosive non abrasive liquid household detergent Allow detergent to run down both sides of plates and ionizing wires Let stand for 5 minutes or fill up laundry tub with water and DAX...

Страница 7: ...from the power board Measuring High Voltage At Power Board A high voltage meter capable of measuring up to 10 000 VDC is required to test the voltage 1 The Air Cleaner should be ON with the cells ins...

Страница 8: ...oard is turned on and the performance light will come on The light on the power switch will be lit even when the APS is open If the power board fails to come on with the fan on check that the sensor i...

Страница 9: ...voltage meter 9 Replace the power box cover 10 Turn ON the Air Cleaner Setting Approximate Voltage Without High Voltage Meter A high voltage meter should be used to set the high voltage If one is not...

Страница 10: ...ve it from the cabinet 6 If you are removing the power box for any length of time tape a cover over the top opening to prevent air from entering into the system Replacing A Tungsten Ionizing Wire Repl...

Страница 11: ...09 D0 0509 D1 0509 11 Power Box Complete No Cover 12 Carbon Filters Set of 3 1156 3 1156 3 1856 3 1856 3 13 Prefilter R0 0855 R1 0855 R2 0855 R8 0855 14 Cell Guide Plastic R1 0603 R1 0603 R1 0603 R1 0...

Страница 12: ...vely power light and per formance indicator light ON or flashing Cells wet from washing Allow cells to dry completely Particles lodged in cell or broken ionizing wire Wash cell Shake particle out of c...

Страница 13: ...basis for the Air Cleaner to function at its peak efficiency The frequency of cleaning will vary from one house to another On average the cells should be cleaned every 3 months Use the chart below to...

Страница 14: ...NOTES 14...

Отзывы: