Goodman AMVS960603BU AA Скачать руководство пользователя страница 9

SYSTEM OPERATION

9

GAS PIPING CHECKS

Before placing unit in operation or after servicing, leak test 

gas connections.  

WARNING

T

O A

V

O

I

D TH

E

 PO

SSI

BL

I

TY OF 

EX

PLO

SI

ON O

R

 F

IRE

, N

EVER

 

USE

 A 

M

ATCH

O

R

 OP

E

N FLA

ME

 TO T

ES

T FO

R

 L

E

A

KS

.

Check for leaks using an approved chloride-free soap and 

water solution, an electronic combustible gas detector, or 

other approved testing methods.

NOTE:

 Never exceed specified pressures for testing. Higher 

pressure may damage the gas valve and cause subsequent 

overfiring,  resulting  in  heat  exchanger  failure.  Disconnect 

this unit and shutoff valve from the gas supply piping system 

before pressure testing the supply piping system with 

pressures in excess of 1/2 psig (3.48 kPa). Isolate this unit 

from the gas supply piping system by closing its external 

manual  gas  shutoff  valve  before  pressure  testing  supply 

piping system with test pressures equal to or less than 1/2 

psig (3.48 kPa).

WARNING

I

F TH

E

 

I

NFO

RM

AT

I

ON 

I

N TH

ESE

 

I

N

S

T

RU

CT

I

ON

S

 

IS

 NOT FOLLO

WE

EX

ACTLY, A

F

IRE

 O

R

 

EX

PLO

SI

ON 

M

AY 

RESU

LT CA

USI

NG P

R

OP

ER

TY DA

M

AG

E

, P

ERS

ONAL

I

N

JUR

Y O

R

 LO

SS

 OF L

I

F

E

.

–   

D

O  NOT  STORE OR  USE GASOLINE OR OTHER FLAMMABLE VAPORS  AND

    LIQUIDS IN  THE VICINITY OF THIS OR  ANY OTHER APPLIANCE.

– 

W

HAT

 

TO

 

DO

 

I

F

 

YO

U

 

SME

LL

 

GA

S

:

 

• 

D

O NOT  TRY  TO LIGHT  ANY APPLIANCE.

 

• 

D

O NOT  TOUCH ANY  ELECTRICAL SWITCH; DO NOT  USE ANY

                      PHONE IN YOUR BUILDING.
 

• 

I

MMEDIATELY CALL YOUR GAS SUPPLIER  FROM A NEIGHBOR’S

 

   PHONE. 

F

OLLOW THE GAS  SUPPLIER’S  INSTRUCTIONS.

 

• 

I

F YOU CANNOT REACH YOUR GAS SUPPLIER, CALL THE  FIRE

                      DEPARTMENT.
–   

I

NSTALLATION AND SERVICE MUST BE PERFORMED BY A QUALIFIED INSTALLER,

   SERVICE AGENCY OR  THE  GAS SUPPLIER.

HIGH ALTITUDE DERATE

The furnace, as shipped, requires no change to run between 

0-4500 feet. At all altitudes the air temperature rise must 

be  within  the  range  listed  on  the  the  Specification  Sheet 

applicable to your model for the fuel used. Manifold pressure 

adjustments and combustion analysis are required for all 

installations above 4500 ft. Refer to “Gas Supply Pressure 

Measurement” section for instruction on how to properly 

measure and adjust manifold “outlet” pressure. The furnace 

should operate for a minimum of 15 minutes before taking 

a combustion sample. Combustion samples should be 

taken from beyond the furnace exhaust and must be within 

provided CO2% range. See table below for recommended 

manifold pressure adjustments and proper CO2% range. Gas 

heating values can vary; further pressure adjustment may 

be necessary to ensure furnace operates within acceptable 

CO2 range.

MODEL

Manifold 

Pressure 

at 5000 ft

Manifold 

Pressure 

at 7500 ft

CO

2

Natural 

Gas

Max Allowable 

Venting (3 in 

only)

*MES960403BU

100 ft

*MES960603BU

100 ft

*MES960805CU

80 ft

2.5" w.c.

2.4" w.c. 6.5 - 8.5

ELECTRICAL CONNECTIONS

WARNING

T

O A

V

O

I

D TH

E

 

RISK

 OF 

E

L

E

CT

RI

CAL 

S

HOC

K

WIRI

NG TO TH

E

 

U

N

I

MUS

T B

E

P

R

OP

ER

LY POLA

RI

Z

E

D AND G

R

O

U

ND

E

D.

WARNING

H

I

GH

 

V

OLTAG

E

D

IS

CONN

E

CT 

ALL

 PO

WER

 B

E

FO

RE

 

SERVI

C

I

NG O

R

I

N

S

TALL

I

NG TH

IS

 

U

N

I

T. 

M

U

LT

I

PL

E

 PO

WER

 

S

O

UR

C

ES

 

M

AY

B

E

 P

RESE

NT. 

F

A

I

L

URE

 TO DO 

S

M

AY CA

USE

 P

R

OP

ER

TY

DA

M

AG

E

, P

ERS

ONAL 

I

N

JUR

Y O

R

 D

E

ATH.

CAUTION

L

AB

E

L ALL 

WIRES

 P

RI

O

R

 TO D

IS

CONN

E

CT

I

ON 

W

H

E

SERVI

C

I

NG CONT

R

OL

S

.

W

IRI

NG 

ERR

O

RS

 CAN CO

USE

 

IM

P

R

OP

ER

 AND DANG

ER

O

US

 OP

ER

AT

I

ON.

V

ERI

FY P

R

OP

ER

 OP

ER

AT

I

ON AFT

ER

 

SERVI

C

I

NG.

 

WARNING

T

O A

V

O

I

D TH

E

 

RISK

 OF 

E

L

E

CT

RI

CAL 

S

HOC

K

I

N

JUR

Y, O

R

 D

E

ATH, TH

E

F

UR

NAC

E

 

MUS

T B

E

 

E

L

E

CT

RI

CALLY G

R

O

U

ND

E

I

N ACCO

R

DANC

E

 

WI

TH LOCAL

COD

ES

 O

R

I

N TH

EIR

 AB

SE

NC

E

WI

TH TH

E

 LAT

ES

E

D

I

T

I

ON OF TH

E

 

N

AT

I

ONAL 

E

L

E

CT

RI

C

OD

E

.

WARNING

H

I

GH

 

V

OLTAG

E

D

IS

CONN

E

CT 

ALL

 PO

WER

 B

E

FO

RE

 

SERVI

C

I

NG O

R

CHANG

I

NG ANY 

E

L

E

CT

RI

CAL 

WIRI

NG. 

M

U

LT

I

PL

E

 PO

WER

S

O

UR

C

ES

 

M

AY B

E

 P

RESE

NT. 

F

A

I

L

URE

 TO DO 

S

M

AY CA

USE

P

R

OP

ER

TY DA

M

AG

E

, P

ERS

ONAL 

I

N

JUR

Y O

R

 D

E

ATH.

Содержание AMVS960603BU AA

Страница 1: ...serviced only by a qualified service technician who is familiar with the safety procedures required in the repair and who is equipped with the proper tools parts testing instruments and the appropriat...

Страница 2: ...arts testing in struments and the appropriate service manual REVIEWALL SERVICEINFORMATIONINTHEAPPROPRIATESERVICE MANUAL BEFORE BEGINNING REPAIRS OUTSIDE THE U S call 1 713 861 2500 Not a technical ass...

Страница 3: ...El mon xido de carbono puede causar enfermedades severas como da o cerebral permanente muerte Las emisiones de mon xido de carbono pueden circular a trav s del aparato cuando se opera en cualquier mo...

Страница 4: ...ENTIFICATION 4 NOMENCLATURE The model and manufacturing number are used for positive identification of component parts used in manufacturing Please use these numbers when requesting service or parts i...

Страница 5: ...s Steel tubular heat exchanger 115 volt silicon nitride igniter Left or right gas entry Line voltage EAC terminal GMVS96 U GMVS960603BU AA GMVS960805CU AA Goodman Brand 96 Ultra Low NOx Gas Furnace 1...

Страница 6: ...the U S A this furnace can be used in the following non industrial commercial applications Schools Office buildings Churches Retail stores Nursing homes Hotels motels Common or office areas In all app...

Страница 7: ...T IN PROPERTY DAMAGE EQUIPMENT DAMAGE PERSONAL INJURY OR DEATH Condensate Drain Lines and Drain Trap Acondensing gas furnace achieves its high level of efficiency by extracting almost all of the heat...

Страница 8: ...ply pressures must be maintained within the ranges specified below The supply pressure must be constant and available with all other household gas fired appliances operating The minimum gas supply pre...

Страница 9: ...l altitudes the air temperature rise must be within the range listed on the the Specification Sheet applicable to your model for the fuel used Manifold pressure adjustments and combustion analysis are...

Страница 10: ...all after the power is turned on will run the outdoor unit at full capacity until the call is removed Use this mode for charging If system is running low stage cooling just cycle power and provide a c...

Страница 11: ...arget Runtime the temporary heat pump hold will be completely removed and the heat pump will become the primary heat source again if it fails to do so the strike count against the furnace will be rese...

Страница 12: ...mps up to full cooling demand airflow by first stepping up to 50 of the full demand for 30 seconds The motor then ramps to 100 of the required airflow A one 1 minute OFF delay at 100 of the cooling ai...

Страница 13: ...D ehum Optional Optional Optional if feature supported by thermostat L1 L2 INDOOR BOARD TERMINAL CONNECTIONS OUTDOOR BOARD TERMINAL CONNECTIONS OUTDOOR TRANSFORMER 24V AC 240V GROUNDRECOMMENDED FIELDP...

Страница 14: ...Refer to the low voltage wiring diagrams for additional wiring details Dehumidistat close on humidity rise R C G Y D ehum Dehumidistat close on humidity rise Figure 41 Fossil Fuel Applications This f...

Страница 15: ...105 C All line voltage wire splices must be made inside the furnace junction box Auxiliary Alarm Switch The control is equipped with a 24VAC Aux Alarm to be used for a condensate switch install desig...

Страница 16: ...sfully been completed the user will have access to system information once in range Option 2 Remove the furnace door ensure the control has power and then read the 3 digits The code will temporarily r...

Страница 17: ...scroll through Menus L6F Lm Cr Sr and rFd 4 Press and release the Center Button The center button is used to enter menus and make selections within menus 5 What will be displayed is the currently sele...

Страница 18: ...d increments Gas Heat Trim Factor Option Menu Gas Heat airflow may be trimmed from 10 to 10 in 2 increments Gas Heat Stage Multiplier Menu CFM This menu allows adjustment of the low fire CFM multiplie...

Страница 19: ...or otherwise trap condensate Use longest radius fittings possible If using 3 venting make the transition from 2 to 3 as close as practically possible Make sure there is no flue gas recirculation into...

Страница 20: ...are for vertical or horizontal termination of the combustion air inlet and the exhaust vent pipes on Category IV gas fired condensing furnaces The DCVK 30 kit can be used for 3 diameter pipe systems...

Страница 21: ...DRAFT AND CIRCULATION BLOWERS The bearings in the induced draft blower and circulator blower motors are permanently lubricated by the manufacturer No further lubrication is required Check motor windin...

Страница 22: ...2 164 327 655 1636 37 97 195 486 12 75 150 300 600 1500 38 23 47 95 189 474 13 69 138 277 555 1385 39 92 185 462 14 64 129 257 514 1286 40 22 45 90 180 450 15 60 120 240 480 1200 41 176 439 16 56 113...

Страница 23: ...t As the external static pressure goes up the temperature rise will also increase Consult the proper tables for tempera ture rise limitation BTU HR Calculation Example The unit being tested takes 40 s...

Страница 24: ...SERVICING 24 GAS VALVE BURNER ASSEMBLY PRESSURE TRANSDUCER INTEGRATED CONTROL BOARD CONTROL TRANSFORMER PRESSURE SWITCHES VENT PIPE CONNECTION COMBUSTION AIR CONNECTION DRAFT INDUCER Component I D...

Страница 25: ...wires must be replaced replace with AWM 105 C 2 64 thick insulation of the same gauge or its equivalent CHECKING THERMOSTAT WIRING DISCONNECT ALL POWER BEFORE SERVICING WARNING 1 Remove the blower co...

Страница 26: ...motor reinstall blower compartment door 6 Turn on electrical power and verify proper unit operation DISCONNECT ALL POWER BEFORE SERVICING WARNING CHECKING DUCT STATIC The maximum and minimum allowabl...

Страница 27: ...erature rise Decrease blower speed to increase temperature rise Refer to Circulator Blower Speed section in the Product Design section of this manual for speed changing details Temperature rise is rel...

Страница 28: ...uced draft blower This voltage to the IBD will vary between furnace models and is dependent on what percentage of maximum fire is being called for The power wires are colored red white and black A gre...

Страница 29: ...e etc and or consult with local gas utility WARNING HIGH VOLTAGE DISCONNECT ALL ELECTRICAL POWER AND SHUT OFF GAS SUPPLY BEFORE SERVICING OR INSTALLING THIS UNIT MULTIPLE POWER SOURCES MAY BE PRESENT...

Страница 30: ...E PERSONAL INJURY OR DEATH 6 Turn on gas to furnace and check for leaks If leaks are found repair and then reinstall burner compartment door 7 Turn on electrical power and verify proper unit operation...

Страница 31: ...ition control No voltage Check transformer room thermostat and wiring If you have 24 volts coming off the transformer but receive approximately 13 volts on the terminal board between C and R check for...

Страница 32: ...utively satisfy the thermostat under the set target time for this number of cycles the system will transition to the heat pump for primary heating dP Menu is enabled if the CF menu is set to 6 this pe...

Страница 33: ...ge non communicating units AC Compressor Cooling Single Stage single stage non comm units AC1 Compressor Cooling Low Stage communicating units AC2 Compressor Cooling High Stage communicating units dHU...

Страница 34: ...a set is correct for the specific model re populate data using correct memory card if required Furnace operates at reduced performance Airflow delivered is less than expected Circulator blower motor i...

Страница 35: ...r Furnace fails to operate 1 Analog Pressure Error Blocked Vent Error Need to check the APS Sensor or its connection if this error is occurred The failure conditions occur as per the following for 5 s...

Страница 36: ...essure switch circuit is closed at start of heating cycle Low stage pressure switch contacts sticking Short in pressure switch circuit wiring Replace low stage pressure switch Repair short in wiring I...

Страница 37: ...erify and correct unit ground wiring if needed Check igniter output from control replace if necessary Furnace fails to operate on high stage furnace operates normally on low stage Induced draft blower...

Страница 38: ...ch condensate switch open Check evaporator drain pan trap piping Fault Code Recall Accessing the furnace s diagnostic menu provides access to the last six faults detected by the furnace Faults are sto...

Страница 39: ...ED CONTROL PK C USE COPPER CONDUCTORS ONLY AT LEAST 105 IT MUST BE REPLACED WITH WIRING MATERIAL HAVING A TEMPERATURE RATING OF 3 IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE FURNACE MUST BE REPLA...

Страница 40: ...contact us Amana Brand Products http www amana hac com about us contact us You can also scan the QR code on the right for the product brand you purchased to be directed to the feedback page GOODMAN B...

Отзывы: