![Goodman AMVS960603BU AA Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/goodman/amvs960603bu-aa/amvs960603bu-aa_service-and-troubleshooting_2243427020.webp)
SYSTEM OPERATION
20
5. The vent termination shall be located at least 3’ above
any forced air inlet located within 10’; and at least 10’
from a combustion air intake of another appliance, except
another direct vent furnace intake.
6. In Canada, the Canadian Fuel Gas Code takes
precedence over the preceding termination instructions.
3" or 4" Diameter
SDR-26 Pipe
2 or 2 1/2" Diameter
SDR-26 Pipe
2" or 3" Diameter
Y Concentric Fitting
2" or 3" Diameter
Rain Cap
These kits are for vertical or horizontal termination of the
combustion air inlet and the exhaust vent pipes on Category
IV gas-fired condensing furnaces. The DCVK-30 kit can be
used for 3” diameter pipe systems. The DCVK-20 kit can be
used for the 2” diameter pipe system. For the correct pipe size
for the furnace. Both the combustion air inlet and the exhaust
vent pipes must attach to the termination kit. The termination
kit must terminate outside the structure and must be installed
per the instructions outlined below for vertical or horizontal
termination. Vertical termination is preferred. Field supplied
pipe and fittings are required to complete the installation.