32
B1
English
During the next steps these components should not move away from each other.
1. Remove transit packaging.
2. Connecting bridge pre-mounted with screws
in one rail-end.
Do not over tighten the grub screws
as this will deform the rail.
3. Connect to the other rail.
Do not over tighten the grub screws
as this will deform the rail.
4. Connect the pilot-elements with the
U-shaped bridge.
5. Place the overlap carrier.
6. To test the rail, first slide the pilot runner along the entire rail before placing the
motor-unit.
7. Install and commission rail.
(chapter 2-4)
Содержание G-Motion
Страница 1: ...G Motion G Motion manual EN 6200 electric curtain track system...
Страница 12: ...8 English...
Страница 16: ...12 English...
Страница 19: ...15 3 English First use auto calibration...
Страница 20: ...16 English...
Страница 40: ...36 B5 86 321 345 14 67 5 42 57 57 40 motor dimens versio G Mot English Technical specifications...