Global Mainstream Dynamic Energy Technology Ltd.
- 42 -
User Manual
GHESS 3.7-4.8-SL hybrid system
As shown in Figure 57, a couple of plants can be managed under one account. A couple of
inverters can be added into under each plant.
My sites: plant list
Inverter: inverters under the plant
Setting: plant related parameter setting
Change password: modify the log in password
5 System Operation
5.1 System Settings
1. Please confirm each connection lines are correctly and securely wired according to Figure 3
2. Turn the DC switch (optional) on
Figure 58 Powervortex 3700TL DC switch (optional)
3. After the LCD lighting on, users can set parameters including password, time, battery type,
county code and operation mode etc. For details please refer to section 4.1.5 LCD Setting. Turn
off the DC switch (optional); wait until the LCD screen is black out
5.2 System Starting
1. Turn on the DC switch (optional) on the Powervortex 3700TL
2. Turn on AC switch, connect to the grid
3. The inverter is ready to work, wait until system status of LCD display shows “Normal” success
4. Turn on the switch on the battery pack and press the red button "SW" until the power light is on,
shown as the figure 59.
-
+
-
+
RS485
Link Port0
ON
OFF
C
O
M
1
C
O
M
3
N
O
1
N
O
3
SW
POWER
ADD
RUN
Console
SOC
ALM
CAN
Link Port1
IN
+
G
N
D
N
O
2
C
O
M
2
Figure 59 Battery pack power and “SW” button
5. Turn on the DC breaker on the battery cabinet, shown as the figure 60.