GBESS 2.4_4.8KWH system user manual
44
5 System Operation
5.1 System Settings
1)
Please confirm each connection lines are correctly and securely wired according to Figure 64
2)
Turn the DC switch (optional) on
PV1
PV2
BUS
GRID
LOAD
DC Switch
ON
OFF
WIFI
TO BAT
CAN
RS485
Ethernet
Figure 65 SolDate3100/3700TL DC switch (optional)
3)
After the LCD lights on, users can set parameters including password, time, battery type, county
code and operation mode etc. For details please refer to section 4.1.5 LCD Setting. Turn off the
DC switch (optional); wait until the LCD screen is black out
5.2 System Starting
1)
Turn on the DC breaker on the battery cabinet
To Meter
DC BREAKER
To Inverter
To Cabinet
To Meter
DC BREAKER
To Inverter
To Ca binet
Figure 66 Battery Cabinet DC BREAKER
2)
Wait until the LCD display of inverter shows “OFF-grid”
3)
Turn on AC switch, connect to the grid