Connecting the main power cable
(See illustration below).
The main power connection must be made in the field-wiring box located underneath
the processor in the rear right corner.
$
When delivered your processor is wired for 3W+N+PE 400V (EUR-MODELS).
Before operating the processor you may need to perform a rewiring to match
your local supply voltage.
•
Connect the cable to the terminal block
(1)
. Lead the cable as shown opposite.
•
If required, make rewiring as described on page 2-13.
Installation Manual - Plate Processor 150
1049
2-12
Installation
Electrical specifications
Processor
T31669
Front
Processor
1
Содержание Plate Processor 150
Страница 1: ...Installation Manual Plate Processor 150 ...
Страница 2: ......
Страница 6: ...Installation Manual Plate Processor 150 1049 0 4 ...
Страница 17: ...1049 Installation Manual Plate Processor 150 2 9 Installation Lifting Transporting 6 5 3 1 2 3 6 4 T 31662 ...
Страница 33: ...1049 Installation Manual Plate Processor 150 2 25 Installation Preparation for processing T31666 3 1 2 ...
Страница 35: ...1049 Installation Manual Plate Processor 150 2 27 Installation Preparation for processing 1 2 3 4 T31667 ...