![Glowworm SAXONY 2 BBU FIRE FRONT Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/glowworm/saxony-2-bbu-fire-front/saxony-2-bbu-fire-front_instructions-for-use-installation-and-servicing_2234650025.webp)
Supplied By www.heating spares.co Tel. 0161 620 6677
25
221648B
6 Instructions for Use
Hand the Instructions for Use to the user and instruct in the safe
and economical use of the fire front and back boiler.
Advise the customer that they should read their Users
instructions before operating the fire and always follow the
advice in the Section headed “Cleaning your Fire”.
Advise that any smell which may be apparent on initial lighting
is quite normal and it will quickly disappear.
Advise that the fire front is fitted with a flue blockage safety
device, and refer to the Instructions for Use.
Important. Advise that soft wall coverings, for example, blown
vinyl wallpaper, are easily affected by heat, they may, therefore,
scorch or become discoloured when close to a heating appliance.
This should be borne in mind when having a heating appliance
installed and when redecorating.
Advise the user that, to ensure the continued efficient and safe
operation of the appliance it is recommended that it is checked
and serviced at regular intervals.
The frequency of servicing
will depend upon the particular installation and usage, but in
general once a year should be enough.
Draw attention, if applicable. to the current issue of the Gas
Safety (Installation and Use) Regulations, Section 35, which
imposes a duty of care on all persons who let out any property
containing a gas appliance.
It is the Law that any servicing is carried out by a competent
person.
Refer to the Instructions for Use and show how to light the fire
front, in the event of an ignition system failure, with a spill or long
match
Advise the user of the precautions necessary to prevent
damage to the system, boiler and the building, in the event of
the heating system being out of use during frost or freezing
conditions.
Reminder, leave these instructions with the user.
Diagram 6.1
5094
SPILL
BURNER
SPILL
3 Flue Systems
7 Servicing
Notes
To ensure the continued efficient and safe operation of the
appliance it is recommended that it is checked and serviced at
regular intervals. The frequency of servicing will depend upon
the particular installation and usage, but in general once a year
should be enough.
It is the Law that servicing is carried out by a competent person.
Make sure that the fire is cold before carrying out any servicing.
After servicing, or replacing parts, always test for gas soundness
with a suitable leak detection fluid. To test the gas tap, refix the
fire front and apply leak detection fluid to all joints, replace the
glass panel, light the burner and visually check all joints for
leakage whilst changing tap settings.
Carry out functional check on controls, see Section 4 and 5.
Other than for replacing the glass panel, internal fire front parts
and lighting the fire front should be removed from its fixings by
reversing the instructions in Section 4 and 5. Make sure that
the side panels and feet are removed. Refit controls cover plinth
so that the fire can stand upright.
Unless stated otherwise reassembly all parts in the reverse
order to removal.
The back boiler should be serviced at this time, refer to Back
Boiler Installation and Servicing Instructions.
The flue blockage safety device MUST NOT be adjusted or
disconnected. If replacing use only the correct and approved
parts.
7.1 Glass Panel
Lift canopy off, take care as it is made of cast iron.
Swing open side panels to their stops, about 5mm, as diagram
7 & 18 (Instructions for Use).
To remove the glass panel, refer to diagram 3.3.
7.2 Internal Fire Front Parts
Remove internal fire front parts as diagrams 15 to 11. (Instructions
for Use).
Remove bottom plate, see diagram 5.3.
Examine these parts and replace as necessary.
7.3 Burner and Injectors
Remove the front castings, see diagram 5.6.
Remove the lower front baffle, see diagram 7.1.
Remove the burner baffle, see diagram 7.1.
Remove the RH. leg, see diagram 5.4.
Remove the side castings, see diagram 5.5.
Advise the user that the ‘Benchmark’ logbook should be
completed by the installation engineer on completion of
commissioning or servicing.